My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2018-143 Bowers Field Pavement Break
>
Meetings
>
2018
>
09. September
>
2018-09-04 10:00 AM - Commissioners' Agenda
>
Res-2018-143 Bowers Field Pavement Break
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2018 3:31:28 PM
Creation date
9/10/2018 3:31:00 PM
Metadata
Fields
Template:
Meeting
Date
9/4/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
d
Item
Request to Approve a Resolution to Authorize the Chairman's Signature Accepting the Federal Aviation Administration's Bowers Field Runway 7/25 Pavement Break Grant Award
Order
4
Placement
Consent Agenda
Row ID
47519
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3-53-0026-014-2018 <br />FAA <br />Airports <br />Current FAA Advisory Circulars Required for Use in AIP Funded <br />and PFC Approved Projects <br />Updated: 2/20/2018 <br />View the most current versions of these ACs and any associated changes at: <br />htlp://www.faa.go v/a rports/resources/advisory ci rcularsa nd <br />http://www.faa,Bov/regu lation s policies/advisory cirwlars/ <br />-- <br />NUMBER TITLE <br />70/7460-U Obstruction Marking and Lighting Change 1 <br />150/5020-1 Noise Control and Compatibility Planning for Airports <br />150/5070-6B Airport Master Plans Changes 1-2 <br />150/5070-7 The Airport System Planning Process Change 1 <br />150/5100-13B Development of State Standards for Nonprimary Airports <br />150/5200-28F Notices to Airmen (NOTAMS) for Airport Operators <br />150/5200-30D Airport Field Condition Assessments and Winter Operations Safety Change 1 <br />150/5200-31C Airport Emergency Plan Changes 1-2 <br />150/5210-5D Painting, Marking, and Lighting of Vehicles Used on an Airport <br />150/5210-7D Aircraft Rescue and Fire Fighting Communications <br />150/5210-BC Airport Water Rescue Plans and Equipment <br />150/5210-14B Aircraft Rescue Fire Fighting Equipment, Tools and Clothing <br />150/5210-15A Aircraft Rescue and Firefighting Station Building Design <br />26 <br />FAA Advisory Circular Required for Use AIP Funded and PFC Approved Projects Updated: 2/20/2018
The URL can be used to link to this page
Your browser does not support the video tag.