Laserfiche WebLink
3-53-0026-014-2018 <br />Current FAA Advisory Circulars Required for Use in AIP Funded <br />and PFC Approved Projects <br />Updated: 2/20/2018 <br />View the most current versions of these ACs and any associated changes at: <br />http://www.faa.gov/airports/resources/advisory circularsand <br />http://www.faa.gov/regulations policies/advisory circulars/ <br />NUMBER <br />TITLE <br />70/7460-1L <br />Change 1 <br />Obstruction Marking and Lighting <br />150/5020-1 <br />Noise Control and Compatibility Planning for Airports <br />150/5070-6B <br />Changes 1- 2 <br />Airport Master Plans <br />150/5070-7 <br />Change 1 <br />The Airport System Planning Process <br />150/5100-13B <br />Development of State Standards for Nonprimary Airports <br />150/5200-28F <br />Notices to Airmen (NOTAMS) for Airport Operators <br />150/5200-30D <br />Change 1 <br />Airport Field Condition Assessments and Winter Operations Safety <br />150/5200-31C <br />Changes 1-2 <br />Airport Emergency Plan <br />150/5210-51) <br />Painting, Marking, and Lighting of Vehicles Used on an Airport <br />150/5210-7D <br />Aircraft Rescue and Fire Fighting Communications <br />150/5210-13C <br />Airport Water Rescue Plans and Equipment <br />150/5210-14B <br />Aircraft Rescue Fire Fighting Equipment, Tools and Clothing <br />150/5210-15A <br />Aircraft Rescue and Firefighting Station Building Design <br />26 <br />FAA Advisory Circular Required for Use AIP Funded and PFC Approved Projects Updated: 2/20/2018 <br />