My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ResolutiontoApproveContractAmendmentCenturyWest
>
Meetings
>
2018
>
09. September
>
2018-09-04 10:00 AM - Commissioners' Agenda
>
ResolutiontoApproveContractAmendmentCenturyWest
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2018 1:25:58 PM
Creation date
8/30/2018 1:23:53 PM
Metadata
Fields
Template:
Meeting
Date
9/4/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
f
Item
Request to Approve a Resolution to Authorize the Chair's Signature on the Contract Amendment with Century West for the Master Plan Update at Bowers Field
Order
6
Placement
Consent Agenda
Row ID
47519
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOWERS FIELD —AIRPORT MASTER PLAN <br />C. Parallel Taxiway and other major taxiways — dimensions, runway separation, airfield access <br />requirements, runway exit taxiways (number, locations, and configuration), confusing geometry, <br />protected areas, and aircraft holding areas, compass rose, consistent with the appropriate <br />Taxiway Design Group (TDG); <br />D. Airfield Pavement — pavement condition as documented in current airport pavement <br />management plan and through on-site observation, evaluate published pavement strength in <br />relation to current and future critical aircraft; <br />E. Evaluation of FAR Part 77 imaginary surface clearance/penetrations (primary, transitional, <br />approach, horizontal, conical); <br />F. Approach area requirements; TERPS 40:1 departure surface for designated instrument runways, <br />as appropriate; <br />G. Helicopter landing area requirements; <br />H. Airfield Lighting (runway, taxiway, approach lighting systems; visual guidance indicators; REAS; <br />rotating beacon); and <br />I. Instrument Approach and Weather Observation requirements. <br />The methodology contained in FAA Advisory Circular 150/5325-4B, Runway Length Reouirements for <br />Airoort D se igen and FAA Airport Design Program Version 4.2d, or latest version, will be used to determine <br />runway length and dimensional criteria, with the results being Incorporated into the master plan. Print• <br />outs from the FAA Airport Design computer program will be submitted to the FAA and included as an <br />appendix to the draft and final reports as appropriate. The Declared Distances module from the Airport <br />Design program will be provided at the time of the ALP preparation (Element 7). <br />The FAA Seattle ADO will review the airside facility requirements with the appropriate FAA divisions <br />(Airway Facilities, Air Traffic, Flight Procedures, etc.) and provide the Consultant with comments prior to <br />the PAC meeting for the facility requirements presentation. <br />Product: Documentation and evaluation of airside facility requirements for input to tater tasks. <br />Task 5.5 - Refine General Aviation (GA) Landside Facilities Requirements <br />Based on updated forecasts of demand and established facility planning standards, the consultant will <br />convert forecast demand into specific landside facility requirements. Both existing and future landside <br />facilities will be analyzed to determine the type and gross quantities of aviation improvements to be <br />Cgggy_W_ EST <br />ZI. . '. ar of <br />Pegs 119 <br />
The URL can be used to link to this page
Your browser does not support the video tag.