My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Final Site Selection Report Kittitas_082118
>
Meetings
>
2018
>
09. September
>
2018-09-04 2:00 PM - 2:00pm Public Hearing
>
Final Site Selection Report Kittitas_082118
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2018 1:29:17 PM
Creation date
8/30/2018 1:23:53 PM
Metadata
Fields
Template:
Meeting
Date
9/4/2018
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Public Hearing to Consider the Purchase of Real Estate Commonly Known as Parcel 611033, US 97/Old Hwy 10 Site, Ellensburg, WA.
Order
1
Placement
2:00pm Public Hearing
Row ID
47527
Type
Hold Public Hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ResponseID Response <br />1 I think it is a very good site. <br />2 Commissioners; Please take in to account the wind blows very hard at that <br />location, drivers will be driving 40-50 mph plus the 40 mile per hour head winds; <br />it is difficult to secure a load of garbage with an 80 mph head wind. Please <br />consider enlarging the current site, and farming the yard waste at another <br />location. <br />3 This is not much different than the cement plant site as far as location. What may <br />figure in is the cost of dealing with the flood water and price of the ground itself. <br />This new site is a little closer to a potential big box site but not enough to be a <br />factor in the decision between the two sites. I like both these sites near the west <br />interchange over the Tjossem Road site. Good job! Shan Rowbotham <br />4 This site looks promising. One big plus is less traffic will have to negotiate that <br />dreadful roundabout. <br />5 This looks like an adequate site. I like to access routes available. It is far better <br />than the airport site. I would put the Tjossem site above it simply because it is <br />more accessible to Kittitas and other points east of Ellensburg since Cle Elum, <br />etc. have access to the one near Cle Elum. <br />6 The US 97/Old Highway 10 site needs to be presented with a similar information <br />as provided for the Tjossem Road and Cement Plant sites in order to solicit <br />constructive feedback. Based on the single aerial provided, it is difficult or <br />impossible for much of the public to even know where exactly the site is, how it <br />would be accessed, or what the adjacent land uses and natural features are. <br />Please ask again when sufficient information is available to provide meaningful <br />feedback. <br />7 I think the US 97 site is too close to Reecer Creek road and potential housing <br />development on that end of the valley. Think the Cement Plant site, which is <br />already a commercial site would be more appropriate site for a waste <br />management/transfer station. I would rather see the site remain in the same <br />location and hold the costs to customers at a low rate. <br />1.If you have any comments or concerns regarding the US 97/Old Highway 10 <br />site, please enter them in the text box below, then click submit. Feedback will <br />be collected until February 23. For more information on the US 97/Old <br />Highway 10 site, please visit the Siting Status tab. <br />2
The URL can be used to link to this page
Your browser does not support the video tag.