My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Final Site Selection Report Kittitas_082118
>
Meetings
>
2018
>
09. September
>
2018-09-04 2:00 PM - 2:00pm Public Hearing
>
Final Site Selection Report Kittitas_082118
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2018 1:29:17 PM
Creation date
8/30/2018 1:23:53 PM
Metadata
Fields
Template:
Meeting
Date
9/4/2018
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Public Hearing to Consider the Purchase of Real Estate Commonly Known as Parcel 611033, US 97/Old Hwy 10 Site, Ellensburg, WA.
Order
1
Placement
2:00pm Public Hearing
Row ID
47527
Type
Hold Public Hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kittitas County Transfer Station <br /> Community Meeting Summary <br /> <br /> <br />3 <br /> <br />that. In addition, during other flooding events, the facility has remained open, however, <br />temporary detour measures are used to keep customer traffic flowing to the transfer station. <br /> <br />Q8. Has a traffic study been completed? Is the traffic study available to review? <br />A8. A traffic study will be conducted during the permitting/environmental permitting process. To <br />estimate projected traffic flows to and from the facility, the project team assumed a 30 year <br />design life, population projections prepared by Washington State’s Office of Financial <br />Mangement, and 2015 and 2016 existing scalehouse traffic data to perform conceptual design <br />of the facility. This information is summarized in the draft December 2016 Basis of Design (BOD) <br />report which is located on the project’s website. <br /> <br />Q9. What will happen to the existing transfer station site? <br />A9. Kittitas County currently leases the current site from the City of Ellensburg. It will be returned to <br />the city. <br /> <br />Q10. What size parcel is needed for the new facility? <br />A10. Based on projected growth and traffic estimates, the estimated size needed for a new facility <br /> is approximately 25 acres. <br /> <br />Q11. What is the current lease payment? <br />A11. *Approximately $33,085.22 per year. And it goes up every year. <br /> <br />Q12. Will the current site need to be torn down? <br />A12. We don’t believe so, but that will need to be determined. <br /> <br />Q13. Where is the funding source for this project? <br />A13. Tipping fees and likely some financing. <br /> <br />Q14. What is the tipping fee revenue generated per month? <br />A14. *June 2017: Garbage $250,049, Yard Waste $10,315.00 <br />2016: Garbage $2,442,420.00, Yard Waste $98,296.51 <br /> <br />*Answers provided after the community meeting.
The URL can be used to link to this page
Your browser does not support the video tag.