Laserfiche WebLink
The solution? <br />•Relocate the transfer station <br />•Bigger site <br />•Drier site <br />•Room for expansion in the <br />future <br />•Five phases for the project <br />•Basis of design <br />•Site selection <br />•Land acquisition/permitting <br />•Detailed design <br />•Construction