My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LP-18-00002 Suncadia Ph 3 Div 14 Resolution
>
Meetings
>
2018
>
08. August
>
2018-08-21 10:00 AM - Commissioners' Agenda
>
LP-18-00002 Suncadia Ph 3 Div 14 Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2018 1:09:55 PM
Creation date
8/16/2018 1:09:36 PM
Metadata
Fields
Template:
Meeting
Date
8/21/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
e
Item
Request to Approve a Resolution for the Suncadia Phase 3 Division 14 Preliminary Plat (LP-18-00002)
Order
5
Placement
Consent Agenda
Row ID
47235
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17. Timing of Improvements: Per the Suncadia 2009 Development Agreement section 5.3 <br />Infrastructure, Surety Bonding or Other Assurances. Infrastructure identified by Trendwest in <br />an approved Site Development Plan must be provided and available for use before the issuance <br />of the first certificate of occupancy for Master Planned Resort Accommodation Units included <br />with such plan. For purposes of final plat approval or issuance of building permits, <br />infrastructure may be guaranteed through surety bonding or other financial assurance device <br />acceptable to the County. The estimated costs of providing all such guaranteed Infrastructure <br />shall be reviewed and approved by the County Public Works Director or designee. Surety <br />bonding or other financial device provided to the County shall be in an amount equal to at least <br />110% of such estimated costs as determined by Trendwest's architects and engineers. <br />18. Water availability certificates shall be provided by Suncadia Water System LLC for each of the <br />10 lots created by this subdivision. <br />19. The Suncadia Phase 3 Division 14 Boundary Line Adjustment (BL -18-00007) shall receive <br />final approval prior to submittal for final plat approval. <br />NOW, THEREFORE BE IT RESOLVED: That the Kittitas County Board of Commissioners hereby <br />grants preliminary plat approval to the Suncadia Phase 3 Division 14 Preliminary Plat (LP -18-00002) and <br />adopts the above Findings of Fact, Conclusions of Law, and Conditions of Approval and the same hereby <br />is, approved with the proposed development configuration (See Exhibit A). <br />DATED this day of <br />ATTEST: <br />❑ Clerk of the Board- Julie Kjorsvik <br />❑ Deputy Clerk of the Board- Mandy Buchholz <br />, 2018 at Ellensburg, Washington. <br />BOARD OF COUNTY COMMISSIONERS <br />KITTITAS COUNTY, WASHINGTON <br />Laura Osiadacz, Chairman <br />Obie O'Brien, Vice -Chairman <br />Cory Wright, Commissioner <br />APPROVED AS TO FORM: <br />Neil Caulkins, Deputy Prosecuting Attorney <br />
The URL can be used to link to this page
Your browser does not support the video tag.