My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2018-127 Naneum Rd Culvert Replacement
>
Meetings
>
2018
>
08. August
>
2018-08-07 10:00 AM - Commissioners' Agenda
>
Res-2018-127 Naneum Rd Culvert Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2018 10:05:08 AM
Creation date
8/15/2018 10:05:02 AM
Metadata
Fields
Template:
Meeting
Date
8/7/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Resolution Authorizing the Chair's Signature on the Local Agency Federal Aid Project Prospectus for the Naneum Road Culvert Replacement Project
Order
29
Placement
Consent Agenda
Row ID
47023
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency <br />Kittitas County Public Works -r Project Title <br />Naneum Road Culvert Replacement l Date -7 <br />8/71!3__] <br />Right of Way <br />[l] No Right of Way Needed <br />* All construction required by the <br />contract can be accomplished <br />within the exiting right of way. <br />Utilities <br />D No utility work required <br />0 Right of Way Needed <br />D No Relocation D Relocation Required <br />I <br />Railroad <br />[l] No railroad work required <br />[l] All utility work will be completed prior to the start <br />of the construction contract <br />D All railroad work will be completed prior to the start of <br />the construction contract <br />D All utility work will be completed in coordination <br />with the construction contract <br />D All the railroad work will be completed in coordination <br />with the construction contract <br />Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project <br />Utility conflicts will be identified during the Design phase of the project, and utility relocation will be <br />coordinated before construction begins. <br />:====:-----=====-~=======:::::===-=-================: <br />FAA Involvement I <br />Is any airport located within 3.2 kilometers (2 miles) of the proposed project? D Yes [l] No "===:::::::::::===========!. I Remarks <br />This project has been reviewed by the legislative body of the administration agency or agencies, or it's <br />designee, and is not inconsistent with the ag e e·~.c:A1mp rehen sive plan for community development. <br />Date <br />DOT Form 140-101 <br />Revised 04/2015 <br />Agen cy .....,1 .._..,- <br />By <br />Previous Editions Obsolete Page 3
The URL can be used to link to this page
Your browser does not support the video tag.