Laserfiche WebLink
Project: Century West Engineering <br />Task 2 <br />2.4 <br />-- <br />-- <br />Bowers Field Environmental Assessment Projects <br />Survey and Base Mapping <br />June, 2018 <br />Description <br />$ <br />To pogr.op!ucal Survey Services -Runwo 7-25 500' x 5100' (SS acre ). <br />Prop os ~d Taxiwey I 50'x I 000' \3.4 ucn:s) <br />Ru nway I 1-29: 500' x 5100' (5 8 o.crus) <br />.Proposed Parallell To.xi way l 50'x4900' •( 16 9 11cres) <br />Pi'opo~c_d CMn~lmg 'l'oxiwil}' 150'xl000' (3.4 acres) <br />Pronos-l!(J l·foJ'IJc{llr taxilane (4 acres} <br />E.'i 1ic11~cs ,(mflcngc, 1111lif.Y locates, A TV rcntol. ~r diem ) <br />Task 2 Total <br />Bowers Field <br />Survey <br />Manager <br />184.30 s <br />1 <br />1 <br />2 <br />Page 1 of 1 <br />Labor Hour Estimate Total Fee <br />Project SuTVey Survey Survey <br />Surveyor Technicia n Crew1-man CrrNI 2-man <br />119.22 s 106.45 $ 92 .76 $ 176.99 ~eG <br />$ . <br />2 32 32 $ ~-~2.82 ~-.. <br />1 4 8 $ 1,960.94 <br />2 32 32 $ 9.492.82 -1 16 20 $ 5,362.22 <br />1 4 8 $ 1 960.94 <br />1 4 8 $ 1,960.94 <br />$ - <br />$ - <br />s - <br />s ----s - <br />$ - <br />$ . <br />$ - <br />s s.000.00 <br />8 92 0 108 1 $ 35,230.68 <br />Total Estimated Fee: $ 35,230.68