My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2018-122 PSA CenturyWest
>
Meetings
>
2018
>
08. August
>
2018-08-07 10:00 AM - Commissioners' Agenda
>
Res-2018-122 PSA CenturyWest
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2018 10:03:19 AM
Creation date
8/15/2018 10:01:24 AM
Metadata
Fields
Template:
Meeting
Date
8/7/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
v
Item
Request to Approve a Resolution to Authorize the Board of County Commissioners Signature on a Professional Services Agreement with Century West for Bowers Field Environmental Services
Order
22
Placement
Consent Agenda
Row ID
47023
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Prepare preliminary design alternatives and plans for grading improvements. Design will be <br />completed to meet the appropriate Aircraft Approach Category (AAC) and Airplane Design <br />Group (ADG) standards. <br />• Prepare a demolition plan to depict civil and electrical items scheduled for removal. <br />• The project manager and project engineer will make 1 site visit and inspection during the <br />survey. <br />• Attend a 25% review meeting with County to discuss alternatives and cost . <br />The project manager and project engineer will attend the meeting. <br />• Prepare summary of the preferred alternative and the <br />preliminary quantity and construction estimates for the project . <br />associated <br />Solicit, receive, record and incorporate into the final form of the preliminary design <br />documents, all comments on preliminary design from the County and FAA . <br />Products: 25% Preliminary Design of the proposed improvements including site layout plan, grading <br />and drainage plan, and construction cost estimates for each project that includes quantities for each <br />construction material. This information will be utilized in the development of the proposed action <br />summary. <br />Deliverables: <br />• Proposed Action Summary <br />• Draft Purpose and Need Summary <br />TASK 3-ENVIRONMENTAL PERMITTING AND COORDINATION <br />Task 3.1 -Agency Meetings/Site Visits/Coordination <br />Objective: The objective of this task is to contact all local, state, and federal agencies that have formal <br />responsibility for the specific impact categories listed in Exhibit 4-1 of FAA Order 1050.lF. The <br />Consultant will conduct coordinated meetings with the County, FAA, and additional permitting <br />agencies as required . <br />Approach: It is assumed that the Consultant will attend four agency meetings. The following are the <br />assumptions of the two meetings with the agencies and participate in three conference calls: <br />• One (1) meeting with FAA and the County. <br />• One (1) meeting with the County. <br />• Three (3) conference calls with the permitting agencies and the County, if required . <br />The Consultant w ill provide Agencies with an already assembled project description and project site <br />plan, identifying areas of potential impact and location of nearby natural resources . <br />Bowers Field Airport Improvements EA <br />April 27, 2018 <br />7
The URL can be used to link to this page
Your browser does not support the video tag.