My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LP-18-00002 Suncadia Ph 3 Div 14 BOCC Staff Report_update 8.6.18
>
Meetings
>
2018
>
08. August
>
2018-08-07 2:00 PM - 2:00pm Public Hearing
>
LP-18-00002 Suncadia Ph 3 Div 14 BOCC Staff Report_update 8.6.18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2018 4:22:09 PM
Creation date
8/6/2018 4:21:58 PM
Metadata
Fields
Template:
Meeting
Date
8/7/2018
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Public Hearing to Consider the Suncadia Phase 3 Division 14 Preliminary Plat (LP-18-00002).
Notes
Scrivener error corrections on Page 6 of staff report.
Order
1
Placement
2:00pm Public Hearing
Row ID
47031
Type
Hold Public Hearing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />10 <br /> <br /> <br />13. Lot and road dimensions are to be shown on the face of the plat. <br /> <br />14. The applicant shall contact the Kittitas County Rural Addressing Coordinator at (509) 962-7523 to obtain <br />addresses prior to obtaining a building permit. A parcel cannot receive a building permit or utilities until such <br />parcel is identified with a 911 address. <br /> <br />15. Civil Plans will be reviewed and approved as submitted prior to final plat approval in accordance with the <br />Development Agreement. <br /> <br />16. Required Infrastructure and Utilities, as defined in the Development Agreement, shall be installed and <br />completed or bonded or other financial guaranties or accommodations made for their completion prior to final <br />plat approval of each subphase. <br /> <br />17. Timing of Improvements: Per the Suncadia 2009 Development Agreement section 5.3 Infrastructure, Surety <br />Bonding or Other Assurances. Infrastructure identified by Trendwest in an approved Site Development Plan <br />must be provided and available for use before the issuance of the first certificate of occupancy for Master <br />Planned Resort Accommodation Units included with such plan. For purposes of final plat approval or <br />issuance of building permits, infrastructure may be guaranteed through surety bonding or other financial <br />assurance device acceptable to the County. The estimated costs of providing all such guaranteed <br />Infrastructure shall be reviewed and approved by the County Public Works Director or designee. Surety <br />bonding or other financial device provided to the County shall be in an amount equal to at least 110% of such <br />estimated costs as determined by Trendwest’s architects and engineers. <br /> <br />18. Water availability certificates shall be provided by Suncadia Water System LLC for each of the 10 lots <br />created by this subdivision. <br /> <br />19. The Suncadia Phase 3 Division 14 Boundary Line Adjustment (BL-18-00007) shall receive final approval <br />prior to submittal for final plat approval. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.