My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
UpdatedProspectusKachessLakeRoad
>
Meetings
>
2018
>
08. August
>
2018-08-07 10:00 AM - Commissioners' Agenda
>
UpdatedProspectusKachessLakeRoad
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2018 9:59:10 AM
Creation date
8/6/2018 9:59:05 AM
Metadata
Fields
Template:
Meeting
Date
8/7/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
z
Item
Request to Approve a Resolution Authorizing the Chair's Signature on the Local Agency Federal Aid Project Prospectus for the Kachess Lake Road Culvert Replacement Project
Order
26
Placement
Consent Agenda
Row ID
47023
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency <br />}(i\tiiaoCounty Public WorksKachess Lake Road Culvert Replacement 18/7/18 <br />Project Title I [ate <br />Right of Way <br />No Right of Way Needed Right of Way Needed <br />All construction required by the E] No Relocation Relocation Required <br />contract can be accomplished <br />within the exiting right of way. <br />Utilities <br />Railroad <br />F No utility work required <br />UV' No railroad work required <br />All utility work will be completed prior to the start <br />E] All railroad work will be completed prior to the start of <br />of the construction contract <br />the construction contract <br />F� All utility work will be completed in coordination <br />F-1 All the railroad work will be completed in coordination <br />with the construction contract <br />with the construction contract <br />Description of Utility Relocation or Adjustments and Existing Major Structures lnvolved in the Project <br />Utility conflicts will be identified during the PE phase of the project, and utility relocation will be coordinated <br />before construction begins. <br />FAA Involvement <br />Is any airport located within 3.2 kilometers (2 miles) of the proposed project? Yes No <br />Remarks <br />This project has been reviewed bvthe legislative body cfthe administration agency or agencies, <br />designee, and is not inconsistent with the agency's comprehensive plan for community development. <br />Agency Kittitas County Public Works <br />By <br />DOT Form 1+o|m Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.