My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LP-18-00002 Suncadia Ph 3 Div 14 Master File
>
Meetings
>
2018
>
08. August
>
2018-08-07 2:00 PM - 2:00pm Public Hearing
>
LP-18-00002 Suncadia Ph 3 Div 14 Master File
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2018 12:50:12 PM
Creation date
8/2/2018 12:45:35 PM
Metadata
Fields
Template:
Meeting
Date
8/7/2018
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Public Hearing to Consider the Suncadia Phase 3 Division 14 Preliminary Plat (LP-18-00002).
Order
1
Placement
2:00pm Public Hearing
Row ID
47031
Type
Hold Public Hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 28, 2018 Job No. 998-722-017 <br />Mr. Mark R. Cook, PE <br />Director/Acting County Engineer <br />Kittitas County, Dept. of Public Works <br />411 N Ruby St, Suite #1 <br />Ellensburg, WA 98926 <br />Re: TumbleCreekPhase3Division14 <br />EngineeringPlanSubmittal <br />Dear Mark: <br />On behalf of New Suncadia, ESM Consulting Engineers, LLC is submitting this letter in response your <br />review letter we received on June 19, 2018 together with the construction plans, storm report, and <br />engineer’s estimate for the project. In an effort to provide concise and direct responses, we have copied <br />the review comments below in italics and ourresponses are in bold. <br />1. Please provide a road design profile for Tired Creek Lane and the access roadway east of the cul <br />de sac. <br />The profile has been provided in the attached construction plan sheets. <br />2. Please provide roadway geometric data (horizontal alignment). <br />The information has been provided in the attached construction plans. <br />3. Please provide supporting stormwater design calculations. Please discuss the capacity of the <br />facility in the golf course and the anticipated capacity utilized by this proposal. <br />The information has been included in the attached storm report. <br />4. It appears that the sanitary sewer (8 inch) connects westerly to Phase 3 Divisions 6 to 9. Please <br />verify that all sewage flows are gravity flows from Phase 3 Division 14. <br />Index #27
The URL can be used to link to this page
Your browser does not support the video tag.