My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ResolutiontoAuthorizeChairSignatureonFAAGrantAwardEA
>
Meetings
>
2018
>
08. August
>
2018-08-07 10:00 AM - Commissioners' Agenda
>
ResolutiontoAuthorizeChairSignatureonFAAGrantAwardEA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2018 12:45:34 PM
Creation date
8/2/2018 12:45:09 PM
Metadata
Fields
Template:
Meeting
Date
8/7/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
y
Item
Request to Approve a Resolution Accepting a Grant Award from the Federal Aviation Administration for Environmental Services at Bowers Field and Authorizing the Chair's Signature on Grant Documents
Order
25
Placement
Consent Agenda
Row ID
47023
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3-53-0026-013-2018 <br />o�Rpl Ayr,' <br />4 FAA <br />Airports <br />�r2rlSi0.Pt <br />Current FAA Advisory Circulars Required for Use in AIP Funded <br />and PFC Approved Projects <br />Updated: 2/20/2018 <br />View the most current versions of these ACs and any associated changes at: <br />http://www.faa.gov/airports/resources/advisory circularsand <br />http://www.faa.gov/regulations policies/advisory circulars/ <br />NUMBER <br />TITLE <br />70/7460-11 <br />Change 1 <br />Obstruction Marking and Lighting <br />150/5020-1 <br />Noise Control and Compatibility Planning for Airports <br />150/5070-66 <br />Changes 1- 2 <br />Airport Master Plans <br />150/5070-7 <br />Change 1 <br />The Airport System Planning Process <br />150/5100-13B <br />Development of State Standards for Nonprimary Airports <br />150/5200-28F <br />Notices to Airmen (NOTAMS) for Airport Operators <br />15hang el - <br />C <br />Chang1 <br />Airport Field Condition Assessments and Winter Operations Safety <br />150/5200-31C <br />Changesl-2 <br />Airport Emergency Plan <br />150/5210-5D <br />Painting, Marking, and Lighting of Vehicles Used on an Airport <br />150/5210-7D <br />Aircraft Rescue and Fire Fighting Communications <br />150/5210-13C <br />Airport Water Rescue Plans and Equipment <br />150/5210-14B <br />Aircraft Rescue Fire Fighting Equipment, Tools and Clothing <br />150/5210-15A <br />Aircraft Rescue and Firefighting Station Building Design <br />24 <br />FAA Advisory Circular Required for Use AIP Funded and PFC Approved Projects Updated: 2/20/2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.