Laserfiche WebLink
Change Order No. 16 <br /> Project No. 150338 <br /> <br />Page 2 <br />The final design will include a technical memorandum outlining the <br />problem statement and investigatory methodology, with details describing <br />the construction details, vendor specifications, quality control measures, <br />and input from basin stakeholders. <br /> <br />Task 3 – Implementation and Monitoring. Under this task Aspect will: <br />• Conduct a site inspection to document construction of a <br />representative home and septic, including confirmation of meter <br />installation (per manufacturer specification) and locations. <br />• Conduct site measurements in accordance with design (Task 2). <br />• Take construction photos and GPS measurements to correlate with <br />parcel information. <br /> <br />We anticipate the pilot study to be at least 16 to 24 months in duration. We <br />assume the County will provide the raw telemetry water meter data on a <br />monthly basis. Aspect will evaluate this data (assume two hours per month) <br />and provide an email status update, including an estimate of consumptive <br />use. The update will be suitable for distribution to basin stakeholders. <br /> <br />Task 4 – Preparation of a Technical Report. Under this task Aspect will <br />compile and produce a technical report documenting design, construction, <br />and implementation of the consumptive use pilot study. The report will <br />conclude with an estimate of consumptive use and additional observation <br />and/or recommendations, as needed. To promote cost efficiency, <br />documentation produced under Task 2 will be directly incorporated into the <br />report. A draft report will be provided for early group review. In addition, <br />we have budgeted for one meeting with the group to discuss findings of the <br />report. Following resolution of any comments, a final report will be <br />produced. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Task 3: $7,500 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Task 4: $3,500 <br /> <br />______________ <br /> <br />Total $16,500 <br />This change amends contract between Aspect Consulting, LLC and Client dated November 6, 2013. <br />Except as amended above, all terms and conditions of contract apply to this contract change. <br />ASPECT CONSULTING, LLC <br />a limited liability company <br />By: <br />Printed Name: Tyson D. Carlson <br /> Associate Hydrogeologist <br />Office: Yakima <br />CLIENT <br />By: <br />Printed Name/Date: <br />V:\150338 Kittitas County General Permit Technical Assistance\Contracts\Proposal Material\CC16_20180416( Consumptive Use Pilot).docx