Laserfiche WebLink
A. RELEVANT CODE SECTIONS ANALYSIS FINDING <br />A.3 Certification from state and local health authorities that water and sewer systems are available to Exhibit 7 and 8 show the development is included in SPUD water <br />accommodate the development; system plan from May 2013, and SPUD sewer comprehensive sewer Satisfied <br />plan. (Index 10 & 11 of Master File) <br />A.4 Provisions to assure permanence and maintenance of common open spaces; Requirement is addressed in the project background and narrative Satisfied <br />document, item 4, to be added as plat notes addressed at final plat. <br />(Index 2 of Master File) <br />I A.5 Statement of intent including estimated cost for landscaping and restoration of natural areas despoiled by Requirement is addressed in the project background and narrative, Satisfied <br />construction including tree planting. item 5, five dollars per linear foot. (In dex 2 of Master File) <br />B. PRELIMINARY APPROVAL CONDTIONS (Res. No. 94-12) ANALYSIS FINDING <br />B.l The site plan submitted on January 4th 1994 to the county staff and to the board of county commissioners <br />on January 18 , 1994 shall be considered the site plan of record for preliminary development plan approval <br />B.2 Prior to submittal of the final development plan, the applicant shall make reasonable effort to reach Reasonable effort was made per project background and narrative and Satisfied <br />agreement with the Hyak Homeowners Association on road improvements, design standards, maintenance the below resolutions for Hyak Road Improvement District: <br />responsibility, and storm water drainage control. The applicant shall demonstrate to the Counts satisfaction Res. 96-13 and Res. 96-40 that a reasonable effort has been made. <br />(Index 2 of M aster File), <br />B.3 Prior to submittal of the final development plan, the applicant shall prepare a wetland mitigation plan for Condition met per project background and narrative. Information all identified wetlands. Wetland encroachments shall not result in a net loss of total wetland areas. The <br />final development plan shall clearly delineate all wetland areas and definitively describe all mitigation provided with Ord. 94-12 for Partial FPUD Approval. Satisfied <br />features, including, but not limited to : construction constraints, mitigation, delineation, associated (Index 2 of Master File) <br />wetlands, swamps and drains. <br />B.4 The applicant shall prep are and submit a final site grading and contour map for the entire property, Pursuant to Public Works memo and project background and Satisfied I indicating all erosion and sedimentation control features. The final grading plan shall be submitted prior narrative, this shall be addressed prior to final plat. A contour map is <br />to the final plan approval. necessary prior to FDP approval. Contour map of the property was <br />submitted on February 15 , 2018. (Index 2, 20, 23 and 25 of Master <br />File) <br />B.5 All structures on all roadways shall have a minimum front yard setback of25 feet, side yard setback of Applicant shall update narrative and amend lot drawing to identify Satisfied <br />10 feet, and a rear yard setback of 15 feet. The footprints for the buildings shall be shown on the final conditioned setbacks. Updated lot drawing showing setbacks was <br />development plan and shall be binding. submitted on February 15, 2018. (Index 22 & 23 of Master File) <br />Page 3 revised/updated by Kittitas County 4/24/2018