My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2018-070
>
Meetings
>
2018
>
05. May
>
2018-05-01 10:00 AM - Commissioners' Agenda
>
Res-2018-070
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2018 12:37:47 PM
Creation date
6/13/2018 12:36:23 PM
Metadata
Fields
Template:
Meeting
Date
5/1/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
c
Item
Continued Closed Record Meeting to Consider Approval of the Amended Hyak PUD Rezone Final Development Plan (RZ-87-00002)
Order
3
Placement
Board Discussion and Decision
Row ID
44356
Type
Conduct closed record meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Building Permits shall only be issued as allowed per platted lot. At no time shall home <br />construction be allowed or building permits issued prior to final platting of any Division that <br />exceeds that allowed by existing platted lots at the time of building permit submittal. <br />Blli•~m&-<3E>B5ffile~· moy-pfe-ette~ll&-J)R6J'-te-fin1d <br />p lattmg-e'Hl&adi:ag of lifl)' Di11ieien with •~p&ney-Fe.m»t&-f~ll& oensl.rtletien:-ifflloo <br />tipe11 anf.l simu-ltaft \!Sly-witA-fmo.1 loltieg er btmtiing-ef.s1titkli¥isi0tt: <br />The project may be developed over a period of 20 years with a possible five-year extension. It is <br />the Project's goal to be complete within a twenty-year period but as has been experienced during <br />previous years political, environmental, economic, and development cycles may increase or <br />decrease the development period of the Project Therefore, the phases and the development period <br />may be slowed or accelerated as circumstances requires or allow. <br />Market and/or weather or seasonal conditions may impact the rate of development. The Project may <br />be accelerated if approvals and conditions allow for said acceleration. The Project may be slowed if <br />approvals, market conditions and/or other conditions cause said slowing. Indoor and or Outdoor <br />Recreation Facilities may be constructed and operated during any of the phases. <br />The land within the recreation open space that is not being developed as home sites may continue to <br />evolve as recreation interests change over the life of the project <br />If approvals occur later then planned or if other actions or conditions delay development the Staging <br />and Phasing of the Project the entire Project may be delayed. The progress of the development of <br />items that include but arc not limited to utilities, the transportation corridor and platting delays may <br />accelerate or delay the development of the parcels. <br />The Project is designed in such a manner that each Phase may follow the proceeding Phase but <br />Phases may be constructed simultaneously and at some times out of order. Infrastructure may be <br />constructed beyond the current Phase that is under construction. <br />The following table format will outline the Staging/phasing plan.
The URL can be used to link to this page
Your browser does not support the video tag.