My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2018-070
>
Meetings
>
2018
>
05. May
>
2018-05-01 10:00 AM - Commissioners' Agenda
>
Res-2018-070
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2018 12:37:47 PM
Creation date
6/13/2018 12:36:23 PM
Metadata
Fields
Template:
Meeting
Date
5/1/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
c
Item
Continued Closed Record Meeting to Consider Approval of the Amended Hyak PUD Rezone Final Development Plan (RZ-87-00002)
Order
3
Placement
Board Discussion and Decision
Row ID
44356
Type
Conduct closed record meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Roads will be built to the Kittitas County Public and Private Road Standards (2005 Road <br />Standards). Road Cross Sections, as provided in the Kittitas County Road Standards (2005 Road <br />Standards) copies of which are attached for reference as Exhibit_l l. <br />Water is provided for by the Snoqualmie Pass Utility District, a copy of which is attached hereto <br />in reduced size for reference as Exhibit_ 7 reflecting the infrastructure already installed <br />throughout the project site. Please also see large-scale water and sewer maps. <br />Sewer is provided for by the Snoqualmie Pass Utility District, a copy of which is attached hereto <br />in reduced size for reference as Exhibit_8 reflecting the infrastructure already installed <br />throughout the project site. Please also see large-scale water and sewer maps. <br />Kittitas County Public Utility District or Puget Sound Energy will provide power. <br />All other dry utilities will be privately owned. <br />b. Arrangement of all building~ w hi ch_shall b~j c;l ~n llfi ~Q by !YQ~ <br />The arrangement of buildings and building type on each parcel will be shown via a small square <br />within the parcels or otherwise noted on the Development Plan Map. There will also be a <br />generalized lot layout map reflecting a structure on a specific lot as a guideline, see Exhibit's_ 4 & <br />9. <br />c. P re liminar y puildil)g plans including floor plan~ and exterior design ang/9r c lev~i9n_vie_ws_; <br />The Hyak Planned Unit Development does hereby adopt, by reference, the preliminary building <br />plans submitted and approved for the Ranch On Swauk Creek, Evergreen Ridge, & Big Creek <br />Planned Unit Developments and have attached additional preliminary building plans, a copy of <br />which in a smaller size is attached hereto as Exhibit_l0. <br />d. Locati<>n _!!:1!51 nu_rri_b~!: of_ off.=~.!:.r_ectJ .~.rid_!! areas im,lµdingJype lt:t_1_d es!it11ate4 ~9.st of~l!rfacing: <br />The location of off street parking is shown on the Development Plan Map see Exhibit 4. As <br />required there will be a minimum of two off street parking spaces, along with the condominiums <br />and commercial areas, which will have underground and possible aboveground, parking with an <br />approximate total of 710 parking spots. Driveways will be gravel with a surfacing cost estimated <br />to $.75 per square foot. A specific description of parking is provided on Exhibit_6 and provided <br />within the "Parking Tables" as shown within Exhibit_ 4. <br />~-._Ihe loc~tj9{!_fil19.9!~en~ions of roads and drivewavs including type and estimated cost of <br />surfacing and road maintenance plans: <br />The location of roads and driveways are shown on the Development Plan Map, see Exhibit_ 4, <br />with specifications provided through the cross sections as attached hereto as Exhibit_ 11. The road <br />cross sections are provided for all roads, meets the intent of this Final Development Plan <br />requirement. Final plats will, as required by Kittitas County Code, provide exact and specific <br />designs and information of roads. At the time of building permits, location and dimensions of <br />driveways will be located and approved by Kittitas Cowity as the county approves access permits. <br />Furthermore the applicant, early on in this process worked with the Local RID to build the <br />existing roads that area already serving the project site. Roadway surfacing is estimated to cost an
The URL can be used to link to this page
Your browser does not support the video tag.