Laserfiche WebLink
TASK 7 HYDRAULICS <br />The original scope of work shown in this task requires an increased level of effort. The original <br />scope for the Story Creek site was to provide a supporting role to COUNTY staff that had <br />intended on delivering the hydraulic design and report(s}. The new scope directed by the <br />COUNTY is that the CONSULTANT shall provide the hydraulic analysis and report(s} for the Story <br />Creek site. <br />The original scope for the Lick Creek site was to provide hydraulic analysis and design for a <br />short length (approx. 300 feet} of new creek channel from the west side of Teanaway Road to <br />the east side and reconnect to the existing channel on the east side of the road. The new scope <br />directed by the COUNTY is to realign the entire Lick Creek channel away from the existing <br />channel on the east side of the road, and take the new creek channel easterly across the DNR <br />property (approx. 2000 feet) to a new discharge point into the Teanaway River. The new or <br />deleted scope is shown below: <br />TASK 7 .1 -Story Creek <br />• Added Sc ope: <br />• Hydraulics <br />• Perform hydraulic modeling to ascertain the hydraulic characteristics necessary to <br />support the design of the new culvert crossing and potential scour countermeasures for <br />the protection of the roadway prism. The hydraulic model will be developed using <br />topographic data collected by the County's selected surveyor. <br />• Bank Stability Assessment and Design <br />• Examine stability of the existing scour protection and creek banks utilizing various <br />design manuals such as, Integrated Streambank Protection Guidelines (ISPG), HEC-18, <br />HEC-23, etc. <br />• Identify proposed measures that are acceptable from a channel stability and habitat <br />perspective. <br />• Scour Analysis <br />• Compute depth of scour estimates for the proposed culvert cross i ng and for any <br />necessary scour countermeasures. <br />• Team Meetings & Permitting Assistance <br />• Key project elements and findings will be discussed with the services and select <br />stakeholders as determined by CONSULTANT and COUNTY staff. Likely participants will <br />include the USACE, WDFW, and potential property owners. <br />• Documentation <br />• The results of the hydraulic and scour assessment will be summarized in two separate <br />documents, specifically, a Preliminary Basis of Design and a Final Basis of Design <br />Report. The report will include a description of the physical characteristics of the site, <br />Scope of Service_ Teanaway Hyd lmp_Amend 01_2018-04-19 <br />Page 4 of 19