Laserfiche WebLink
• Existing roadway as-builts and any other existing site data. <br />• Deleted Assumptions: <br />• GENERAL <br />• The COUNTY will plan, arrange, and facilitate all meetings. <br />• The COUNTY is performing the following work: plans, specifications, and estimate <br />(excluding structural plans, specs, & estimate) for Lick Creek location; staging/detour <br />plans and MOT plans; all roadway and civil design; stream plans, planting plans, <br />revetment and associated stream alignments; stormwater analysis/design; structures <br />for private property access; hydraulic design at Storey Creek location; drainage design; <br />walls at bridge approaches, roadside safety; right-of-way plan development. <br />• NEPA/SEPA <br />• SEPA will be exempted as the project will qualify as a Fish Habitat Enhancement Project <br />through WDFW. <br />• ENVIRONMENTAL PERMITTING <br />• Individual Permit required for Corps 404 and Ecology 401. <br />• HYDRAULICS <br />• Story Creek <br />• CONSUL TANT will serve as a mentor and review role . All documentation such as <br />hydraulic analysis, bank stability assessment and design, and scour analysis to be <br />performed by COUNTY. <br />• Lick Creek <br />• COUNTY will provide combined topographic and bathymetric surface (1 foot <br />contours with point and breakline data) with extents discussed at the 7 /20/17 site <br />visit. <br />• The creek will have geomorphic features (e.g. creek substrate, woody material, <br />etc) which will replicate the natural stream morphology above the existing road <br />crossing. <br />• The hydraulic analysis will include information to support the design of the <br />Teanaway Road bridge and up to two (2) residential access bridges . <br />EXCLUSIONS <br />The added or deleted exclusions are shown below: <br />• Added Exclusions: <br />• ENVIRONMENTAL <br />• Supporting discipline reports . <br />• Full Cultural Resources monitoring during construction. <br />• CWA Section 404 Individual Permit <br />• Department of Ecology CWA Section 401 Water Quality Certification <br />• Long-term mitigation and site management <br />Scope of Service_Teanaway Hyd lmp_Amend 01_2018-04-19 <br />Page 18 of 19