Laserfiche WebLink
TASK 13.2 -Lick Creek <br />• Added Scope : <br />• ENVIRONMENTAL <br />• Complete 100% mitigation/restoration plan set using a landscape architect stamped <br />channel grading, habitat features, and revegetation plan sheets .. <br />• HYDRAULICS <br />• Assist with the creek realignment and scour/bank protection design elements. <br />• STRUCTURES <br />• Provide response(s) to 90% PS&E Submittal review comments. <br />• Prepare complete structural calculations in accordance with the WSDOT and AASHTO <br />requirements for final design of spread footing foundations compatible with <br />premanufactured culvert design as produced and developed by the culvert <br />manufacturer. <br />• Provide 100% Special Provisions and Engineer's Estimate of Probable Construction Cost <br />for advertisement. <br />• Provide 100% list of bid items and quantity calculations. <br />• Perform Quality Control per the Project Specific Quality Plan on the deliverables prior <br />to submission to the COUNTY. <br />• ROADWAY <br />• Prepare complete roadway calculations in accordance with the WSDOT and/or AASHTO <br />requirements for any barrier length of need. <br />• Provide compiled 100% Design Plans, Special Provisions, and Engineer's Estimate of <br />Probable Construction Cost for advertisement of the culvert replacement. <br />• Perform Quality Control per the Project Specific Quality Plan on the deliverables prior <br />to submission to the COUNTY. <br />• DELIVERABLES <br />• ENVIRONMENTAL <br />• One (1) set of responses to 90% PS&E submittal review comments . <br />• One {1} set of 100% Design Plans (ll"x17" sheets and PDF's} <br />• STRUCTURES <br />• One (1) set of response(s) to 90% PS&E submittal review comments . <br />• One (1) set of 100% Design Plans (11" x17" sheets and PDF's) <br />• One (1) set of Special Provisions pertain to replacement structure and structural <br />elements. <br />• One (1) list of bid items and quantities with backup calculations. <br />• One (1) set of Final Structural Calculations sealed by a licensed Professional <br />Engineer. <br />• One (1) Probable Construction Cost for structural elements for advertisement. <br />• ROADWAY <br />• One (1) set of responses to 90% comments <br />Scope of Service_ Teanaway Hyd lmp_Amend 01_2018-04-19 <br />Page 14 of 19