Laserfiche WebLink
roads as allowed by the Kittitas County Road Standards. All internal roads shall be designed and <br />constructed to Kittitas County Road Standards. Sidewalks are not required within the Palomino <br />Fields Plat and are not being constructed as a condition of this Agreement. <br />7. Affordable Housing. Affordable housing is not required nor will it be provided within the <br />Palomino Fields Plat. <br />8. Infrastructure Requirements. <br />8.1 Domestic Water. Group A Water Systems, as defined by WAC 246-294-010, include <br />systems having 15 or more connections. Phases of the Palomino Fields Plat shall be <br />served by a Group A Water System per the statutory requirements and as approved by the <br />Washington State Department of Health. The water system will be constructed in phases <br />commensurate with the phased development as shown on Exhibit E attached hereto. <br />8.2 Irrigation Water. The first eight (8) lots of Phase 1, shall be provided irrigation water by <br />Cascade Irrigation District. All other phases shall be provided irrigation water by the <br />Ellensburg Water Company. The irrigation distribution system shall be owned privately <br />and the design, maintenance and operation of said irrigation distribution system shall be <br />approved by the district or company providing the irrigation water, or, if the district does <br />not have an approval process, designed by an Engineer licensed in the State of <br />Washington. The irrigation system will be constructed in phases commensurate with the <br />phased development shown on Exhibit G attached hereto. <br />8.3 Sewage Disposal. Any Community Septic Systems, which may serve two to seven <br />parcels, will be designed by a licensed designer and approved by Kittitas County. The <br />Community Septic Systems will be constructed in phases commensurate with the phased <br />development as shown on Exhibit E. The Community Septic Systems will not be required <br />to be developed prior to final platting of each or any phase but will be constructed <br />simultaneously with buildings as permitted by the Kittitas County Community <br />Development Services Department and the Kittitas County Health Department. Prior to <br />receiving Occupancy Permit for any building constructed the community septic system <br />shall be completed and approved by the Kittitas County Health Department. <br />8.4 Storm Drainage. The owner of each parcel shall be responsible to maintain the storm <br />water field established for the Palomino Fields Plat as it pertains to that individual parcel. <br />Road drainage shall meet the Eastern Washington Storm Water guidelines. The Applicant <br />shall develop the Palomino Fields Plat in accordance with a storm water permit issued by <br />the Washington State Department of Ecology. Storm water systems shall be designed in <br />each phase to manage total storm water of completed phases that is generated by a 24- <br />hour, 25-year storm event. <br />8.5 Fire Protection. Sprinklers shall be located in each residence to provide Fire Protection <br />for the residence and will be constructed to current standards. Neither system wide <br />storage tanks nor fire hydrants are required for the Project. <br />8.6 Other Infrastructure Requirements. Utilities, including, but not limited to, dry utilities <br />such as power, phone and internet shall be provided to the property line of each parcel. <br />9. Parks and Open Space Preservation. The Parks and Open Space Preservation for the Palomino <br />Fields Plat have been established by Kittitas County through the adoption of Resolution No. <br />2008-160. The identified open space tracts shall be proportionately owned by tenants in common, <br />and retained by each home owner, and will be assessed, taxed, and foreclosed upon each building <br />lot not fulfilling their obligation. <br />10. Phasing. The Project will be constructed and receive final plat approval through the development <br />of individual divisions (plats) within each of the five (5) Phases. The description of the Phasing