Laserfiche WebLink
2018 Rock Materials <br />Bid Opening February 22,2018, at 10:00 a .m . <br />SCHEDULE 'A' <br />Price Per Ton at Vendor's Identified Location <br />ESTIMATED I ! <br />ITEM QUANTITY Ellensburg Cement Products I <br />NO. (In TONS) ITEM DESCRIPTION I I <br />I <br />I Identified Pick Up <br />Price Per Ton -, I <br />Vendor I Price Per Ton -TOTAL PRICE -TOTAL PRICE- <br />Loaded i County Loaded Vendor Loaded i County Loaded I Location(s) <br />I I AIIECP <br />Locations <br />1A 8,000 Maintenance Sand $8.25 $7 .95 $66,000 .00 $63,600.00 Where Available <br />Crushed Surfacing Top All ECP <br />Course (WSDOT Locations <br />2A 8,000 Standard Specifications) $7.75 $7.45 $62 ,000 .00 $59 ,600.00 Where Available - <br />Crushed Surfacing Base AIIECP <br />Course (WSDOT I Locations <br />3A 7,000 Standard Specifications) $7.65 $7.35 $53,550 .00 $51,450.00 Where Available -!--. -- <br />Common Borrow AIIECP <br />(WSDOT Standard Locations <br />4A 1,000 Specifications) $4 .05 $3.75 $4,050.00 $3 ,750.00 Where Available <br />Light Loose Rip Rap AIIECP <br />(WSDOT Standard Locations <br />5A 1,000 Specifications ) __ $24 .75 $20.75 $24,750 .00 $20,750.00 Where Available ---1- <br />All ECP <br />Quarry Spalls (WSDOT Locations <br />6A 1,000 ---Standard Specifications) $8.05 $7.75 $8,050 .00 _ $7,750.00 Where Available <br />Kittitas Quarry <br />7A 2.750 Coverstone Maintenance $9 .95 $9.65 $27 ,362.50 $26 .537.50 (Clerf) <br />I I <br />Sub-total before Tax --I $245,762,50 $233,437.50 -----. <br />SALES TAX-I 8.00% $19.661,00 $18,675.00 <br />! <br />i I I Total Schedule "A" -I $265,423.50 I $252,112.50 <br />SCHEDULE "A" 2018