My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8-15-Teanaway Res-2017-139
>
Meetings
>
2017
>
08. August
>
2017-08-15 10:00 AM - Commissioners' Agenda
>
8-15-Teanaway Res-2017-139
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2018 12:31:51 PM
Creation date
6/13/2018 12:29:40 PM
Metadata
Fields
Template:
Meeting
Date
8/15/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
m
Item
Request to Approve a Resolution Authorizing the Chair's Signature on the Interagency Agreement with the Federal Highway Administration Authorizing the Reimbursement of Funds to Kittitas County Public Works for the Teanaway Hydraulic Improvement Project
Order
13
Placement
Consent Agenda
Row ID
38819
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
II. STATEMENT OF WORK <br />This agreement provides for funding of a progression of project activities: Initially only <br />preliminary design is eligible for reimbursement. Final design, utility relocation, right of way <br />acquisition will not be eligible for reimbursement until an environmental decision document has <br />been completed and approved by FHWA-VvTL}_ IfFHWA-WFL's environmental decision <br />document indicates significant impacts or identifies the preferred alternative to be a "no-build" <br />alternative, then this reimbursable agreement will be terminated with no eligibility for funding <br />post environmental decision activities. .Construction will not be eligible for reimbursement <br />until the Final PS&E package is approverl- <br />FHW A-WFL may amend or terminate this agreement to adjust to project development, <br />environmental, or construction needs. <br />A. Preliminary Design <br />1. Design <br />1.1. Perform a site survey as necessary to support the design and environmental <br />compliance needs of the project. <br />1.2. Prepare and submit a preliminary plan package to FHWA-WFL. The preliminary <br />plan package shall reflect the work as described in the Project Description above. <br />Any deviations fwm the described work must be approved in writing by FHW A: <br />WFL. Include a preliminary cost estimate with the preliminary plan package. <br />2. Environmental Compliance <br />Note: Federally funded projects must fully comply with all requirements afthe National <br />Environmental Policy Act (NEPA). An appropriate range of reasonable alternatives will <br />be evaluated for this project based on its scope and extent. Amendments to the scope of <br />this may be required upon completion of the environmental clearance document and <br />decision. <br />2.1. Coordinate environmental compliance efforts with WSDOT local programs regional <br />staff and FHW A-WFL environmental staff. Utilizing the infonnation provided <br />through work performed under this reimbursable agreement, Kittitas COlUlty will <br />follow WSDOT Local Agency Guidelipe (LAG) environmental process and <br />coordinate with WSDOT and FHW A-WFL on the environmental decision document. <br />2.2. Support FHW A-WFL in environmental compliance efforts, coordinate, develop and <br />complete tasks including resource surveys, studies and assessments for <br />documentation <br />2.2.1. National Historic Preservation Act (NHP A)
The URL can be used to link to this page
Your browser does not support the video tag.