My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2018-014 Roslyn
>
Meetings
>
2018
>
01. January
>
2018-01-16 10:00 AM - Commissioners' Agenda
>
Res-2018-014 Roslyn
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2018 12:31:40 PM
Creation date
6/13/2018 12:29:23 PM
Metadata
Fields
Template:
Meeting
Date
1/16/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
t
Item
Request to Approve a Resolution for the 2018 Distressed County Sales and Use Tax Infrastructure Improvement Program Agreement with the City of Roslyn
Order
20
Placement
Consent Agenda
Row ID
41806
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Roslyn <br />Transmission Main Replacement West of River Crossing <br />Item Quantity Unit Unit Price Amount <br />Mobilization and Demolition 1 LS $ 68,810.00 $ 68,810.00 <br />Trench Excavation Safety System 1 LS $ 16,500.00 $ 16,500.00 <br />Erosion Control 1 LS $ 16,500.00 $ 16,500.00 <br />Utility Easement Acquisition 1 LS $ 20,000.00 $ 20,000.00 <br />12-inch 01 Water Pipe, Including Fittings 5600 LF $ 90.00 $ 504,000.00 <br />12-inch Butterfly Valves 10 EA $ 2,500.00 $ 25,000.00 <br />Bank Run Gravel for Trench Backfill 3200 CY $ 20 .00 $ 64,000.00 <br />Crushed Surfacing Top Course 490 TN $ 20.00 $ 9,800.00 <br />Seeding, Fertilizing, and Mulching 3750 SY $ 1.00 $ 3,750.00 <br />Connect to EXisting 4 EA $ 3,000.00 $ 12,000.00 <br />Minor Changes 1 CALC $ 16,500.00 $ 16,500.00 <br />Construction Sub-total $ 756,860.00 <br />Tax (8%) $ 60,548.80 <br />Contingency (20%) $ 163,481.76 <br />Construction Total $ 980,890.56 <br />Engineering and Administrative Costs (25%) $ 245,222.64 <br />Total Project Cost $ 1,227,000.00 <br />Note: Items, quantities, and costs have been taken from the City of Roslyn's Water System Plan, dated June 2014. <br />The total project cost estimated above reflects the combined costs of Transmission Improvement Projects T-2 & T-3 <br />as listed in the Water System Plan.
The URL can be used to link to this page
Your browser does not support the video tag.