My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2018-014 Roslyn
>
Meetings
>
2018
>
01. January
>
2018-01-16 10:00 AM - Commissioners' Agenda
>
Res-2018-014 Roslyn
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2018 12:31:40 PM
Creation date
6/13/2018 12:29:23 PM
Metadata
Fields
Template:
Meeting
Date
1/16/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
t
Item
Request to Approve a Resolution for the 2018 Distressed County Sales and Use Tax Infrastructure Improvement Program Agreement with the City of Roslyn
Order
20
Placement
Consent Agenda
Row ID
41806
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gray & Osborne. inc .. ConSlilting Engineers <br />PROJECT T-5: TRANSMISSION MAIN REPLACEMENT BETWEEN WTP <br />AND RESERVOIR <br />Schedule: Beyond 2018 <br />Estimated Cost: $769,500 <br />This project would replace existing steel transmission main along Nelson Dairy Road to <br />the City's reservoir. The project would entail 3,500 linear feet of 12-inch ductile iron <br />transmission main, valves, and appurtenances. The line would replace the existing <br />leaking line to reduce leakage and increase system reliability. <br />PROJECT D-1: WEST DAKOTA AVENUE WATER MAIN <br />Schedule: 2015 <br />Estimated Cost: $66,880 <br />As part of the improvements to City Hall, this project will install approximately 205 LF <br />of 8-inch PVC water main on West Dakota Avenue east of South 1 sl Street. This will <br />increase available fire flow to the area and increase system reliability. <br />PROJECT D-2: SOUTH THIRD STREET AND SR 903 WATER MAIN TO HIGH <br />SCHOOL REPLACEMENT <br />Schedule: Beyond 2018 <br />Estimated Cost: $1 ,231 ,600 <br />The City plans to replace 6,000 LF of the existing coal tar-lined steel IO-inch pipe that <br />upplies the schools in the southeast part of the syst 1l1 . The I O-inch water main \ ill be <br />replaced with 12-inch PVC from So lith 3 rd Street and We l al it' mia A enuc to the <br />schools. The remaining 2,500 LF of the pipe th a t continues from South 3rd lreel and <br />West California Avenue to South Pennsylvania Street will be abandoned in place. <br />PROJECT D-3: HORVAT ROAD 4-INCH WATERLINE REPLACEMENT <br />Schedule : Beyond 2018 <br />Estimated Cost: $457,000 <br />This project would replace approximately 2,600 linear feet of 4-inch waterline on Horvat <br />Road with 8-inch PVC pipe to increase fire flow to the area . <br />PROJECT WTP-1: WATER TREATMENT PLANT EXPANSION <br />Schedule: Beyond 2018 <br />Estimated Cost: $968,500 <br />This project would upgrade the existing slow sand facility from 1.0 mgd to 1.5 mgd by <br />adding a third slow sand filter bed. The project would include the third bed, filter media, <br />site piping and appurtenances, site work, and instrumentation and electrical. <br />Cl/)' o{Rosll'1I -3 <br />WaleI' System Plan JlIne 2014
The URL can be used to link to this page
Your browser does not support the video tag.