Laserfiche WebLink
Gray & Osborne. inc .. ConSlilting Engineers <br />PROJECT T-5: TRANSMISSION MAIN REPLACEMENT BETWEEN WTP <br />AND RESERVOIR <br />Schedule: Beyond 2018 <br />Estimated Cost: $769,500 <br />This project would replace existing steel transmission main along Nelson Dairy Road to <br />the City's reservoir. The project would entail 3,500 linear feet of 12-inch ductile iron <br />transmission main, valves, and appurtenances. The line would replace the existing <br />leaking line to reduce leakage and increase system reliability. <br />PROJECT D-1: WEST DAKOTA AVENUE WATER MAIN <br />Schedule: 2015 <br />Estimated Cost: $66,880 <br />As part of the improvements to City Hall, this project will install approximately 205 LF <br />of 8-inch PVC water main on West Dakota Avenue east of South 1 sl Street. This will <br />increase available fire flow to the area and increase system reliability. <br />PROJECT D-2: SOUTH THIRD STREET AND SR 903 WATER MAIN TO HIGH <br />SCHOOL REPLACEMENT <br />Schedule: Beyond 2018 <br />Estimated Cost: $1 ,231 ,600 <br />The City plans to replace 6,000 LF of the existing coal tar-lined steel IO-inch pipe that <br />upplies the schools in the southeast part of the syst 1l1 . The I O-inch water main \ ill be <br />replaced with 12-inch PVC from So lith 3 rd Street and We l al it' mia A enuc to the <br />schools. The remaining 2,500 LF of the pipe th a t continues from South 3rd lreel and <br />West California Avenue to South Pennsylvania Street will be abandoned in place. <br />PROJECT D-3: HORVAT ROAD 4-INCH WATERLINE REPLACEMENT <br />Schedule : Beyond 2018 <br />Estimated Cost: $457,000 <br />This project would replace approximately 2,600 linear feet of 4-inch waterline on Horvat <br />Road with 8-inch PVC pipe to increase fire flow to the area . <br />PROJECT WTP-1: WATER TREATMENT PLANT EXPANSION <br />Schedule: Beyond 2018 <br />Estimated Cost: $968,500 <br />This project would upgrade the existing slow sand facility from 1.0 mgd to 1.5 mgd by <br />adding a third slow sand filter bed. The project would include the third bed, filter media, <br />site piping and appurtenances, site work, and instrumentation and electrical. <br />Cl/)' o{Rosll'1I -3 <br />WaleI' System Plan JlIne 2014