My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2018-014 Roslyn
>
Meetings
>
2018
>
01. January
>
2018-01-16 10:00 AM - Commissioners' Agenda
>
Res-2018-014 Roslyn
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2018 12:31:40 PM
Creation date
6/13/2018 12:29:23 PM
Metadata
Fields
Template:
Meeting
Date
1/16/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
t
Item
Request to Approve a Resolution for the 2018 Distressed County Sales and Use Tax Infrastructure Improvement Program Agreement with the City of Roslyn
Order
20
Placement
Consent Agenda
Row ID
41806
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPTER 7 <br />IMPROVEMENT PROGRAM <br />INTRODUCTION <br />This chapter presents a Capital Improvement Program (CIP) in accordance with the <br />requirements of WAC 246-290. Planned water system improvements, associated costs, <br />and scheduling are presented in the following sections. These improvements are based <br />on deficiencies identified in Chapters 3. Financing ofthese improvements is discussed in <br />Chapter 8. <br />In the future other projects may arise that are not identified as part of the City's water <br />system C(P. Such projects may be deemed necessary for ensuring water quality, <br />preserving emergency water supply, accommodating transportation improvements <br />proposed by other agencies, or addressing unforeseen problems with the City'S water <br />system. Due to budgetary constraints, the completion of these projects may require that <br />the proposed completion date for the projects in the CIP be rescheduled. The City retains <br />the flexibility to reschedule proposed projects and to expand or reduce the scope of <br />proposed projects, as best determined by the City when new information becomes <br />available for evaluation. <br />The CIP is categorized into five categories: <br />• Transmission Projects (T) <br />• Distribution System Projects (D) <br />• Water Treatment Plant Projects (WTP) <br />• Miscellaneous Projects (M), and <br />• Operation and Maintenance Projects (O&M) <br />Each category is further divided into a detailed list of projects presented chronologically <br />over the 6-year and 20-year planning periods . Projects after the 6-year planning period <br />are described along with a cost estimate, but are not scheduled for a specific year. <br />RECOMMENDED IMPROVEMENTS <br />PROJECT T-l: RIVER CROSSING REPLACEMENT <br />Schedule: 2014 <br />Estimated Cost: $469,200 <br />Currently, the City's water is carried from Domerie Creek to the treatment plant via a <br />single waterline , which crosses the Cle Elum River on an old steel truss tootbridge. The <br />City has received funding through the Drinking Water State Revolving Fund to finance <br />7-1 <br />Waler System Plan June 2014
The URL can be used to link to this page
Your browser does not support the video tag.