Laserfiche WebLink
11. Indicate the estimated number of businesses created/retained by the project. <br />According to the U .S . Census Bureau , 2015 Zip Code Business Patterns, there are 44 business <br />establishments in Roslyn . These will be retained by the water main transmission project. <br />12. Indicate the estimated number of jobs created/retained by the project. <br />The PS&E preparation (design) phase will take approximately 12 months . Based upon past, <br />similar PS&E preparation projects, the following part-time jobs will be created during the design <br />phase: <br />Desi~n-related Jobs <br />Position Count <br />Project Manager I <br />Surveyor 2 <br />Survey Tech I <br />Lead Engineer I <br />Design Engineer 1 <br />CAD Tech I <br />Admin 1 <br />Total 8 <br />The construction phase will take approximately 4 months. During the construction phase, the <br />following full-time jobs will be created: <br />Construction-related Jobs <br />Position Count <br />Superintendent I <br />Surveyor 2 <br />Foreman I <br />Crew 3 <br />Total 7 <br />According to the U.S . Census Bureau, 2015 Zip Code Business Patterns, there are 284 people <br />employed in Roslyn. <br />Therefore, the total number of jobs created/retained by the project is 299.