My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2017-170
>
Meetings
>
2017
>
10. October
>
2017-10-17 10:00 AM - Commissioners' Agenda
>
Res-2017-170
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2018 12:22:48 PM
Creation date
6/13/2018 12:21:35 PM
Metadata
Fields
Template:
Meeting
Date
10/17/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
l
Item
Request to Approve a Resolution Authorizing Chairman's Signature on Formal Task Order Document No. 003 with Jacobs Engineering Group Inc. for the Teanaway Road Hydraulics Improvements
Order
12
Placement
Consent Agenda
Row ID
40001
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.7. Review each submittal and/or deliverable check and verify deliverables compliance <br />with scope, schedule, budget and quality. <br />2. Project Controls <br />2.1. Monitor expended and remaining budget, and forecast cost to complete; <br />2.2. Prepare monthly invoices and back-up, and monthly progress reports. <br />2.3 . Subconsultant management to include subcontract execution, review and <br />incorporation of subconsultant invoices and progress reports and monitoring of <br />subconsultant financial status. <br />2.4. Monitoring and updating project design schedule . <br />3. Quality <br />3.1. Develop and administer Quality Assurance Plan <br />4. Deliverables <br />4.1. Project Management Plan (including quality plan and safety plan) <br />4.2. Meeting notes (up to 20 meetings); <br />4.3 . Monthly progress report and invoice; <br />TASK 2 DATA ANALYSIS <br />1. Review, evaluate, analyze, and incorporate data provided by Owner: <br />1.1. Hydraulic parameters from stream channel survey and analysis performed by COUNTY. <br />(Owner to provide by September 30th, 2017). <br />1.2. Topographic survey and base map(s) (Owner to provide by September 30th, 2017) <br />1.3. Existing right-of-way plans and legal descriptions of parcel(s) in project area. (Owner to <br />provide by September 30th, 2017) <br />1.4. Existing reports and/or studies of the vicinity, if any (Owner to provide by September <br />3Oth,2017) <br />TASK 3 GEOTECHNICAL FIELD INVESTIGATION & LABORATORY ANALYSIS <br />Based on a cursory review of available geologic data, the culvert replacements are located in alluvium <br />deposits from Story Creek, Lick Creek, and nearby Teanaway River. We anticipate the alluvium to be <br />cobble and boulder-laden and overlying sandstone estimated to vary in depth from 20 to 35 feet below <br />ground. The road embankments overlying the culverts appear to be about 10 to 15 feet tall and <br />comprised of fill of unknown material. The projects will be mostly affected by the geotechnical <br />characteristics of the alluvium and depth to sandstone. Key geotechnical considerations will include <br />excavation and dewatering to construct the culvert, and foundations to support it. <br />Task 3.1-Storey Creek project site <br />1. Review publicly available geologic maps, nearby well logs, and other available <br />geologic/geotechnical information at or near the project site. <br />2. Participate in one (1) site visit to observe surface conditions, and drill rig access, and mark <br />exploration locations for public utility locate.
The URL can be used to link to this page
Your browser does not support the video tag.