My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2017-170
>
Meetings
>
2017
>
10. October
>
2017-10-17 10:00 AM - Commissioners' Agenda
>
Res-2017-170
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2018 12:22:48 PM
Creation date
6/13/2018 12:21:35 PM
Metadata
Fields
Template:
Meeting
Date
10/17/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
l
Item
Request to Approve a Resolution Authorizing Chairman's Signature on Formal Task Order Document No. 003 with Jacobs Engineering Group Inc. for the Teanaway Road Hydraulics Improvements
Order
12
Placement
Consent Agenda
Row ID
40001
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXCLUSIONS <br />6.2.7.WDFW stated there is some existing geomorphic analyses for the Teanaway River. <br />CONSULTANT will utilize existing information to the extent possible; however the <br />previous analyses may have been associated with the Teanaway River rather than <br />specific to Lick Creek. <br />6.2.8.A sediment transport model will not be developed . It is assumed the proposed <br />structures will allow for natural sediment movement by following WDFW <br />guidelines. <br />6.2 .9.The hydraulic analysis will include information to support the design of the <br />Teanaway Road bridge and up to two (2) residential access bridges. <br />6.2 .10. The current culverts under residential access are not within any FEMA Flood <br />Hazard Boundary. It is assumed the proposed structures and channel design will <br />meet County Floodplain Code and therefore a no-rise analysis is not required. If <br />the design is identified not meeting County Floodplain Code additional effort will <br />be required that is beyond this scope of work. <br />6.2 .11 . No bank stability analyses will be conducted on the residential/private property. <br />6.2 .12 . The creek design will utilize the existing creek alignment and geomorphic <br />features (e.g. creek substrate , woody material, etc). <br />1. GENERAL <br />1.1. All Civil and MOT design elements . <br />1.2. Development of specification run list <br />1.3. Compilation of specifications and i nto one document. <br />1.4. Compilation of estimate into one document. <br />1.5. Assembly of Plans, Specifications, and Estimate submittals. <br />1.6. Bid Support Services and Design Services During Construction . <br />2. ENVIRONMENTAL <br />2.1. NEPA full Environmental Analysis (Environmental Assessment (EA) or Environmental <br />Impact Statement (EIS)). <br />2.2. SEPA review and Local Agency Permits/Approvals/Reports. <br />3. HYDRAULICS <br />3.1. Storey Creek <br />3.1.1. All hydraulic documentation (i.e. hydraulic analysis, bank stability assessment and <br />design, and scour analysis). <br />3.1.2 . Temporary diversion assistance <br />3.1.3. Support during construction <br />3.2. Lick Creek <br />3.2.1.Post-fire hydrology will not be conducted. <br />3.2 .2.Temporary diversion assistance <br />3.2.3.Support during construction <br />4. RIGHTOFWAY
The URL can be used to link to this page
Your browser does not support the video tag.