My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2017-170
>
Meetings
>
2017
>
10. October
>
2017-10-17 10:00 AM - Commissioners' Agenda
>
Res-2017-170
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2018 12:22:48 PM
Creation date
6/13/2018 12:21:35 PM
Metadata
Fields
Template:
Meeting
Date
10/17/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
l
Item
Request to Approve a Resolution Authorizing Chairman's Signature on Formal Task Order Document No. 003 with Jacobs Engineering Group Inc. for the Teanaway Road Hydraulics Improvements
Order
12
Placement
Consent Agenda
Row ID
40001
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TASK 13.2 -Lick Creek <br />1. ENVIRONMENTAL <br />1.1. Review plans and specifications for adherence to complete permit commitments and <br />exemptions. <br />1.2. Development of Environmental Commitment Summary. <br />1.3. Development of Permit Appendix. <br />1.4. Perform Quality Control per the Project Specific Quality Plan on the deliverables prior <br />to submission to the COUNTY. <br />2. HYDRAULICS <br />2.1. Assist with the creek realignment and scour/bank protection design elements. <br />3. DELIVERABLES <br />3.1. ENVIRONMENTAL <br />3.1.1.0ne (1) Environmental Commitment Tracking data sheet. <br />3.2. HYDRAULICS <br />3.2.1.No deliverables identified. <br />ASSUMPTIONS <br />1. GENERAL <br />1.1. AutoCAD and Civil 3D will be the drawing and modeling platform. <br />1.2. The Jacobs Project Manager has the ability to move budget/hours between Tasks to <br />meet deliverables. <br />1.3. The COUNTY will plan, arrange, and facilitate all meetings. <br />1.4. The COUNTY is performing the following work: plans, specifications, and estimate <br />(excluding structural plans, specs, & estimate) for Lick Creek location; staging/detour <br />plans and MOT plans; all roadway and civil design; stream plans, planting plans, <br />revetment and associated stream alignments; stormwater analysis/design; structures <br />for private property access; hydraulic design at Storey Creek location; survey; utilities <br />coordination and arranging relocation; drainage design; walls at bridge approaches, <br />roadside safety; purchase of title reports; right-of-way plan development and filing; bid <br />documents. <br />2. NEPA/SEPA <br />2.1. NEPA is Categorically Exempt (CE 23) <br />2.2. SEPA will be exempted as the project will qualify as a Fish Habitat Enhancement Project <br />through WDFW. <br />2.3. Section 106 will be determined as "May Affect", and will require SHPO concurrence <br />2.4. Wetland and stream impacts will require a full impact assessment. <br />2.5. Mitigation plan will be required. <br />2.6. Formal Biological Assessment is anticipated. <br />2.7. Two (2) site visits