My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2017-170
>
Meetings
>
2017
>
10. October
>
2017-10-17 10:00 AM - Commissioners' Agenda
>
Res-2017-170
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2018 12:22:48 PM
Creation date
6/13/2018 12:21:35 PM
Metadata
Fields
Template:
Meeting
Date
10/17/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
l
Item
Request to Approve a Resolution Authorizing Chairman's Signature on Formal Task Order Document No. 003 with Jacobs Engineering Group Inc. for the Teanaway Road Hydraulics Improvements
Order
12
Placement
Consent Agenda
Row ID
40001
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TASK 4 GEOTECHNICAL ENGINEERING ANALYSIS & REPORT <br />The geotechnical scope and cost estimate assumes the replacement culvert/bridge for Story Creek and <br />Residential Culvert Crossings #1 and #2 will be less than 20-foot-span structures and will not require <br />seismic hazard evaluation for the structure/foundations, and will be supported on shallow foundations. <br />The replacement bridge for Lick Creek project is assumed to have a single-span up to about 80 feet long <br />and will be subject to AASHTO and WSDOT bridge design specifications with seismic hazard evaluation, <br />and could be supported on shallow foundations or pile foundations. <br />A geotechnical report will be produced for Story Creek Project. One geotechnical report will be <br />produced to encompass the Lick Creek and Residential Culvert Crossing #1 and #2 Site projects because <br />the Sites are in proximity with anticipated similar subsurface conditions and geotechnical <br />considerations. <br />TASK 4.1-Storey Creek <br />1. Analyze collected field investigation data to characterize the geotechnical properties of the <br />subsurface. <br />2. Evaluate and provide design/construction recommendations for temporary excavations, and <br />construction dewatering, if needed. <br />3. Provide lateral earth pressures for design any wing walls or abutment walls. <br />4. Evaluate and provide shallow foundation bearing and lateral resistance geotechnical design <br />parameters and construction considerations. <br />5. Evaluate overall stability of approach embankment immediately adjacent the culvert . <br />6. Provide grain size analysis results of bank and channel material for use in scour analysis. <br />Scour analysis to be completed by Hydraulics Engineer. <br />7. Participate in up to two, one hour design team meetings by phone to discuss geotechnical <br />design and construction elements of the project. <br />8. Provide up to 4 hours of Plans and Specifications support throughout the project. <br />9. Deliverables: <br />9.1. One (1) Draft Geotechnical Report <br />9.2. One (1) Final Geotechnical Report. To be delivered after CONSULTANT receives one (1) <br />set of Owner's comments. Owner shall combine all comments to one (1) document and <br />submit to CONSULTANT. <br />TASK 4.2 -Lick Creek <br />1. Analyze collected field investigation data to characterize the geotechnical properties of the <br />subsurface. <br />2. Determine seismicity, seismic ground motions, and identify seismic hazards for Lick Creek Site . <br />3. Evaluate and provide design/construction recommendations for temporary excavations, and <br />construction dewatering, if needed. <br />4. Provide lateral earth pressures for design of any wing walls or abutment walls.
The URL can be used to link to this page
Your browser does not support the video tag.