`SLR FC SG <br />ki'l'n rns c'ouHiv <br />KITTZTASS Ca'UWgrW <br />DEPARTMENT OF PUBLIC WORKS <br />Task 06 — Documentation, Permit Application, and Acquisition: This task includes preparation <br />and submittal of all required permit applications and supporting documentation for the project. <br />See list of permits in attached scope. <br />Task 07 — Hydraulics: This task includes stream data collection and engineering analysis of <br />stream characteristics and interaction with the existing and proposed bridge. The deliverable is <br />one (1) each of Preliminary Basis of Design Technical Memo and Final Basis of Design Report. <br />Task 08 — Right Of Way: This task includes effort required to complete right-of-way <br />process(es) required to acquire property and/or temporary construction easement(s) — if any are <br />necessary - in order to construct this project. <br />Task 09 — Project Kickoff Meeting: Select members of the delivery team will attend one (1) <br />project kickoff meeting. WSDOT will also attend the kickoff meeting. <br />Task 10 — 30% Design: This task includes preliminary effort to document the project execution, <br />bridge type and location, right-of-way need(s), and strategy of incorporating the MOT and <br />upstream bank stabilization. <br />Task 11— 60% Over The Shoulder Meeting: This task includes attendance of select members of <br />the delivery team at one (1) over -the -shoulder meeting to review and document comments on <br />current progress to an approximate 60% level. <br />Task 12 — 90% Design: This task includes delivery of 90% plans, specifications, and estimate <br />for review and comment by the County and stakeholders. <br />Task 13 — 100% Design: This task includes delivery of 100% (Final) plans, specifications, and <br />estimate, as well as all calculations, to the County for the purpose of advancing the package to <br />Advertisement. <br />This task order covers time and expenses to support Kittitas County for 8 months, and is <br />estimated at $279,603. This task is anticipated to remain active until April 30, 2018. <br />Assumptions & Exceptions: <br />See attached scope <br />Deliverables: <br />See attached scope. <br />Cost Breakdown: <br />Total - $279,603 (appx. 2,202 hours), allocated as follows: <br />Task 01 - Project Management (168 hours) - $29,284 <br />