Laserfiche WebLink
4.3. Closing costs such as recording fees, title insurance fees, transfer taxes, etc.; penalty <br />costs for pre -payments; costs of a pre-existing mortgage; the prorate share of real <br />property taxes paid subsequent to vesting title to the COUNTY. <br />4.4. Continuing negotiations for those parcels listed for condemnation. <br />4.5. Appraisal and review appraisals for condemnation purposes. <br />4.6. Providing litigation assistance to the COUNTY and legal counsel during appeals, <br />grievances, hearings, and/or court proceedings. <br />4.7. Legal descriptions. <br />4.8. Relocation services. <br />5. STRUCTURAL <br />5.1. Structural Evaluation of any/all items pertaining to the COUNTY -provided "Temporary <br />Bridge". <br />5.2. Evaluation of change orders and/or Cost Reduction Incentive Proposals (CRIPs) by the <br />Contractor. <br />5.3. Site visit(s) for clarification of construction -related issues or review of unusual or <br />unanticipated conditions. <br />5.4. Performance of Bridge Load Rating. This work can be included via amendment for <br />post -design activities. <br />OWNER CLARIFICATIONS OR PROVIDED DATA <br />1. Existing hydraulic parameters from stream channel survey and analysis <br />2. Topographic survey and base map(s) <br />3. Existing right-of-way plans and legal descriptions of parcel(s) in project area. <br />4. Existing reports and/or studies of the vicinity <br />5. Specifications of COUNTY -owned temporary bridge <br />6. Plans and specifications for MOT and upstream bank stabilization. <br />