My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2017-136 Formal Task Order
>
Meetings
>
2017
>
08. August
>
2017-08-15 10:00 AM - Commissioners' Agenda
>
Res-2017-136 Formal Task Order
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2018 12:17:35 PM
Creation date
6/13/2018 12:16:43 PM
Metadata
Fields
Template:
Meeting
Date
8/15/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
h
Item
Request to Approve a Resolution Authorizing the Chairman's Signature on Formal Task Order Document Number 001 with Jacobs Engineering Group, Inc.
Order
8
Placement
Consent Agenda
Row ID
38819
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.3. Closing costs such as recording fees, title insurance fees, transfer taxes, etc.; penalty <br />costs for pre -payments; costs of a pre-existing mortgage; the prorate share of real <br />property taxes paid subsequent to vesting title to the COUNTY. <br />4.4. Continuing negotiations for those parcels listed for condemnation. <br />4.5. Appraisal and review appraisals for condemnation purposes. <br />4.6. Providing litigation assistance to the COUNTY and legal counsel during appeals, <br />grievances, hearings, and/or court proceedings. <br />4.7. Legal descriptions. <br />4.8. Relocation services. <br />5. STRUCTURAL <br />5.1. Structural Evaluation of any/all items pertaining to the COUNTY -provided "Temporary <br />Bridge". <br />5.2. Evaluation of change orders and/or Cost Reduction Incentive Proposals (CRIPs) by the <br />Contractor. <br />5.3. Site visit(s) for clarification of construction -related issues or review of unusual or <br />unanticipated conditions. <br />5.4. Performance of Bridge Load Rating. This work can be included via amendment for <br />post -design activities. <br />OWNER CLARIFICATIONS OR PROVIDED DATA <br />1. Existing hydraulic parameters from stream channel survey and analysis <br />2. Topographic survey and base map(s) <br />3. Existing right-of-way plans and legal descriptions of parcel(s) in project area. <br />4. Existing reports and/or studies of the vicinity <br />5. Specifications of COUNTY -owned temporary bridge <br />6. Plans and specifications for MOT and upstream bank stabilization. <br />
The URL can be used to link to this page
Your browser does not support the video tag.