My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2017-136 Formal Task Order
>
Meetings
>
2017
>
08. August
>
2017-08-15 10:00 AM - Commissioners' Agenda
>
Res-2017-136 Formal Task Order
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2018 12:17:35 PM
Creation date
6/13/2018 12:16:43 PM
Metadata
Fields
Template:
Meeting
Date
8/15/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
h
Item
Request to Approve a Resolution Authorizing the Chairman's Signature on Formal Task Order Document Number 001 with Jacobs Engineering Group, Inc.
Order
8
Placement
Consent Agenda
Row ID
38819
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.1. Prepare complete roadway calculations in accordance with the WSDOT and/or AASHTO <br />requirements for any barrier length of need. <br />4.2. Provide 100% Design Plans, Special Provisions, and Engineer's Estimate of Probable <br />Construction Cost for advertisement of the bridge replacement and upstream bank <br />stabilization. <br />4.3. Provide 100% Summary of Quantities, and list of bid items for set of signed and <br />reproducible contract documents. <br />4.4. Provide compiled100% set of Special Provisions for all disciplines <br />4.5. Perform Quality Control per the Project Specific Quality Plan on the deliverables prior <br />to submission to the COUNTY. <br />5. DELIVERABLES <br />5.1. ENVIRONMENTAL <br />5.1.1.One (1) Environmental Commitment Tracking data sheet. <br />5.2. STRUCTURAL <br />5.2.1. Response(s) to 90% PS&E submittal review comments. <br />5.2.2.One (1) set of 100% Design Plans (11" x17" sheets and PDF's) <br />5.2.3. One (1) set of Special Provisions pertain to bridge and structural elements <br />5.2.4. One (1) set Summary of Quantities pertaining to bridge an structural elements <br />5.2.5. One (1) list of bid items and quantities with backup calculations <br />5.2.6. One (1) set of Final Structural Calculations sealed by a licensed Professional <br />Engineer <br />5.2.7. One (1) Probable Construction Cost for structural elements for advertisement. <br />5.3. HYDRAULICS <br />5.3.1. Details for the 100% Design Plans. Hydraulics details will be incorporated into <br />either the Roadway or Structural plan sheets. <br />5.3.2. One (1) set of Special Provisions pertaining to hydraulic elements. <br />5.3.3. One (1) Probably Construction Cost for hydraulic elements for advertisement. <br />5.4. ROADWAY <br />5.4.1. One (1) set of 100% Design Plans (11" x17" sheets and PDF's) <br />5.4.2. One (1) set of Special Provisions pertaining to roadway elements <br />5.4.3. One (1) set Summary of Quantities pertaining to roadway elements <br />5.4.4. One (1) list of bid items and quantities with backup calculations <br />5.4.5. One (1) Probable Construction Cost for roadway elements for advertisement. <br />ASSUMPTIONS <br />1. GENERAL <br />1.1. AutoCAD and Civil 3D will be the drawing and modeling platform. <br />1.2. The Jacobs Project Manager has the ability to move budget/hours between Tasks to <br />meet deliverables. <br />2. NEPA/SEPA <br />2.1. NEPA is Categorically Exempt <br />
The URL can be used to link to this page
Your browser does not support the video tag.