Laserfiche WebLink
Kittitas County <br />On-caU-2017 <br />Task Order 8 <br />CONSULTANT LINE ITEM COST ESTIMATE WORK SHEET <br />CONSULTANT FEE DETERMINATION BY KPFF FOR KITTITAS COUNTY ON CALL <br />ROAD 6 BRIDGE PS&E ESTIMATION OF MANAGEMENT AND ENGINEERING HOURS COST <br />Project Technical Senior Design CAD Tech Project <br />TASK ORDER 8 Principal (Dave Manager Specialist Engineer Engineer (Structural & Adminislralel <br />McMullen) (Tom (Tom (Structural & (Structural & Civil) (A <br />Whiteman) Whiteman) Civil) Civ~) Fernando) MU l TIPU.EH <br />ITE.M I SCOPE OF WORK. $6250 $6923 $6923 $.42...40 $35...16 139..00 $2648-26552 <br />1 CONTRACT MANAGEMENT AND COORDINATION <br />~Oo."O_",","' ,~"""OC 1 5 2 ~ 2 $757 <br />Client Communications 6 $1,471 ---- <br />. ~taff, Files & General Project Coordination 16 4 $3,590 ---I - <br />Subconsultanl Coordinalion 0 <br />Invoicing & Project Summaries 15 6 6 $1,914 <br />labor Subtotal 1 : 3 34 0 0 0 0 14 $7,732 <br />$0 <br />2 SITE OR CLIENT VISIT (AS REQUESTEO OR NEEDEO) <br />Travel (RT) __ 4 _, 4 4 ! $1,559 <br />Prep, Meet wI Cnty 2 4 2 $1,005 <br />Labor Subtotal 2: 6 0 8 6 0 I 0 $2,564 <br />$200 <br />3 DEVELOPMENT OF PS&E -CONTRACT BID DOCUMENTS <br />Sheet 1 -Cover 10 30 100 $1,557 <br />Sheet 2 -Gen Notes, Quantities, Specs, Cross Secjion 40 240 80 200 $6,255 <br />Sheet 3 -General Plan, Layout & Elevation 60 220 80 260 $7,226 <br />StI<!41"1 . Foul"ld'lIo.n . ~tm(lltl, V .... W.1t1 1 20 40 200 200 $4,756 ---~ SheetS -Foundation, Abutment W,Walls-2 20 160 160 $4,176 <br />Sheel6 -Framing Plan and Girders 1 30 40 160 200 $4.567 <br />Sheet 7 -Girders 2, Bearings, Joint 20 40 160 160 $4,176 1-.------;So -~ Sheet 8 -Approach Slab(s) 10 20 60 $3,020 <br />Sheet 9 -Bridge Rail & Guardrail 1 30 200 40 200 $5,248 <br />Sheet 10 -Guard Rail 2 & Mise 10 120 40 160 $3,772 <br />Plan and Calculation Qulaity Control Checks and Revie'h'S 6.0 80 240 40 120 $6,764 <br />Plan Coordination with CountyJSurve_v-, Civil, Geotechnical) 60 100 20 40 $2,830 <br />Load Rating 20 200 40 $2,993 <br />Civil Engineering (road x-sec, profile, grades, access roads, detour <br />plan, devialions, guardra ~ review, Siripping, TESC, drainage review, 80 400 400 360 $13,436 <br />misc) <br />Labor Subtotal 3: 6 6 41 193 150 242 0 $70,794 <br />$0 <br />4 COSTRUCTION SUPPORT -OPTIONAL <br />-.Jaon.w.I.II~.IWt.. RFI and Shop Review, Questions <br />Site or Oou.rtl~'Vl!t.l <br />1 I __ 4 __ t __ '_2 __ r __ '_2 6 1 $4,064 <br />labor Subtotal 4: 1 0 4 12 12 6 I 1 $4,064 <br />I <br />TOTAL LABOR 10 48 45 213 168 248 15 $ 85,154 <br />TOTAL REIMBURSABLE $ 200.00 <br />MANAGEMENT RESERVE (OPT tONAL) $ 2,000 <br />GRAND TOTAL -NOT TO EXCEED $625 $3,323 $3,115 $9,031 $5,907 $9,672 $397 $ 87,354