Kittitas County
<br />On-caU-2017
<br />Task Order 8
<br />CONSULTANT LINE ITEM COST ESTIMATE WORK SHEET
<br />CONSULTANT FEE DETERMINATION BY KPFF FOR KITTITAS COUNTY ON CALL
<br />ROAD 6 BRIDGE PS&E ESTIMATION OF MANAGEMENT AND ENGINEERING HOURS COST
<br />Project Technical Senior Design CAD Tech Project
<br />TASK ORDER 8 Principal (Dave Manager Specialist Engineer Engineer (Structural & Adminislralel
<br />McMullen) (Tom (Tom (Structural & (Structural & Civil) (A
<br />Whiteman) Whiteman) Civil) Civ~) Fernando) MU l TIPU.EH
<br />ITE.M I SCOPE OF WORK. $6250 $6923 $6923 $.42...40 $35...16 139..00 $2648-26552
<br />1 CONTRACT MANAGEMENT AND COORDINATION
<br />~Oo."O_",","' ,~"""OC 1 5 2 ~ 2 $757
<br />Client Communications 6 $1,471 ----
<br />. ~taff, Files & General Project Coordination 16 4 $3,590 ---I -
<br />Subconsultanl Coordinalion 0
<br />Invoicing & Project Summaries 15 6 6 $1,914
<br />labor Subtotal 1 : 3 34 0 0 0 0 14 $7,732
<br />$0
<br />2 SITE OR CLIENT VISIT (AS REQUESTEO OR NEEDEO)
<br />Travel (RT) __ 4 _, 4 4 ! $1,559
<br />Prep, Meet wI Cnty 2 4 2 $1,005
<br />Labor Subtotal 2: 6 0 8 6 0 I 0 $2,564
<br />$200
<br />3 DEVELOPMENT OF PS&E -CONTRACT BID DOCUMENTS
<br />Sheet 1 -Cover 10 30 100 $1,557
<br />Sheet 2 -Gen Notes, Quantities, Specs, Cross Secjion 40 240 80 200 $6,255
<br />Sheet 3 -General Plan, Layout & Elevation 60 220 80 260 $7,226
<br />StI<!41"1 . Foul"ld'lIo.n . ~tm(lltl, V .... W.1t1 1 20 40 200 200 $4,756 ---~ SheetS -Foundation, Abutment W,Walls-2 20 160 160 $4,176
<br />Sheel6 -Framing Plan and Girders 1 30 40 160 200 $4.567
<br />Sheet 7 -Girders 2, Bearings, Joint 20 40 160 160 $4,176 1-.------;So -~ Sheet 8 -Approach Slab(s) 10 20 60 $3,020
<br />Sheet 9 -Bridge Rail & Guardrail 1 30 200 40 200 $5,248
<br />Sheet 10 -Guard Rail 2 & Mise 10 120 40 160 $3,772
<br />Plan and Calculation Qulaity Control Checks and Revie'h'S 6.0 80 240 40 120 $6,764
<br />Plan Coordination with CountyJSurve_v-, Civil, Geotechnical) 60 100 20 40 $2,830
<br />Load Rating 20 200 40 $2,993
<br />Civil Engineering (road x-sec, profile, grades, access roads, detour
<br />plan, devialions, guardra ~ review, Siripping, TESC, drainage review, 80 400 400 360 $13,436
<br />misc)
<br />Labor Subtotal 3: 6 6 41 193 150 242 0 $70,794
<br />$0
<br />4 COSTRUCTION SUPPORT -OPTIONAL
<br />-.Jaon.w.I.II~.IWt.. RFI and Shop Review, Questions
<br />Site or Oou.rtl~'Vl!t.l
<br />1 I __ 4 __ t __ '_2 __ r __ '_2 6 1 $4,064
<br />labor Subtotal 4: 1 0 4 12 12 6 I 1 $4,064
<br />I
<br />TOTAL LABOR 10 48 45 213 168 248 15 $ 85,154
<br />TOTAL REIMBURSABLE $ 200.00
<br />MANAGEMENT RESERVE (OPT tONAL) $ 2,000
<br />GRAND TOTAL -NOT TO EXCEED $625 $3,323 $3,115 $9,031 $5,907 $9,672 $397 $ 87,354
|