Laserfiche WebLink
KITTITAS COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />layout will be quickly reviewed to ensure this is the case. Kpff to discuss the pros and cons with <br />the County before proceeding with a final decision and design. <br />4. Kpffto layout new bridge to ensure, as best as possible, that no right-of-way takes will be <br />required. <br />5. Kpffto design guardrail layout in collaboration with the County. Guardrail on the bridge will <br />meet current WSDOTIAASHTO design specifications and criteria based on road use and speed. <br />Guardrail off the bridge will follow as best as possible the WSDOT Standard Plans for guardrail <br />layout. The final guardrail alignment will achieve a best fit between the WSDOT Standard Plans <br />and the actual space available to fit it. Based on early site visits it appears that the rail will need <br />to make some very short radius turns to fit into the irrigation canal access roads and nearby <br />residential driveways. <br />6. KPFF will provide all necessary Civil engineering effort including specifications, quantities and <br />costs as needed for the development of these plans. This is assumed to include roadway sections, <br />grade profiles , drainage issues, utility concerns, and shoulder and ditch layouts. County to <br />coordinate with Kpffregarding guardrail off the bridge. <br />7. Kpffto provide specifications related to the PS&E they develop only. An effort will be made to <br />consolidate all specs on to the plans to work in conjunctions with the WSDOT Standard <br />Specifications (2016 and all amendments and GSP revisions to the latest date possible -likely <br />January of 20 18). <br />8. The bridge will be closed during construction. <br />9. Currently the new bridge is assumed to be designed for two 12 foot lanes , and two 2 foot <br />shoulders. The width shall meet approach widths at a minimum, and as prescribed by the County . <br />10. No sidewalks. <br />11. County will inform Kpffif curbs are required and if they are what type, size, and the extent of <br />layout beyond the bridge is desirable. <br />12. Bridge superstructure will have a 2% crown from the centerline of the roadway , or as prescribed <br />by the County. <br />13. Stripping and final channelization of the approach and bridge will be provided by the KPFF. <br />14. There will be no drains on the bridge . <br />15. Bridge will be a single span. <br />16. Voided pre-cast box slabs with a 5 inch topping and overlay will likely provide the most cost <br />effective design and will serve as the basis of the Kpff design unless prescribed differently by the <br />County. <br />17. Kpff, as EOR, to make use of the Sargent concept development plans for efficiency to the extent <br />possible but are not obligated to follow the Sargent layout and design explicitly. <br />Milestones: <br />Kpffwill provide a PDF of the plans for the 30%, 75%, and 100% design at the dates shown below. For <br />efficiency, the design will continue following milestone submittal while the county performs review of <br />3