My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2017-115 Task Order
>
Meetings
>
2017
>
07. July
>
2017-07-18 10:00 AM - Commissioners' Agenda
>
Res-2017-115 Task Order
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2018 12:10:01 PM
Creation date
6/13/2018 12:09:36 PM
Metadata
Fields
Template:
Meeting
Date
7/18/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
o
Item
Request to Approve a Resolution Authorizing the Chairman's Signature on Formal Task Order Document Number 008 with KPFF Consulting Engineers
Order
15
Placement
Consent Agenda
Row ID
38280
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />Formal Task Order Document <br />(KPFF) <br />Task Order Number 008 <br />Maximum Amount Payable _---'-$_8~7,'____5_00 __ Completion Date 3/3112019 <br />The general provisions and clauses of Local Agency Agreement Number (KCPW 2017- <br />19ENG2) shall be in full force and effect for this Task Order. <br />Location of Project: Kittitas County <br />Project Title: Road 6 Bridge Design (PS&E) <br />Description of Work: <br />Kpff shall perfonn the engineering analysis and design of the Road 6 Bridge to prepare for <br />bidding advertisement date of April 2018. <br />Scope of Work: <br />Perform appropriate analysis and design calculations in accordance with the general and specific <br />guidelines and specifications as contained in the WSDOT Bridge Design Manual (BDM) and if applicable <br />or necessary to the LRFD AASHTO Design Specifications, and the Local Agency Design Manual. In all <br />cases the most current edition, manual, guidelines or specifications shall provide criteria and minimal <br />guidelines as required to meet all FHW A funding requirements. <br />The work and fee are divided into 4 segments: <br />Management <br />The specific line items are provided in the Consultant Fee Determination sheet. In general Kpffwill <br />manage the development of the PLANS, SPECS & ENGINEERING COST ESTIMATE (PS&E) in such <br />a manner to ensure the County is able to achieve the desirable bidding date. This effort will include <br />appropriate in-house duties such as invoicing, contract compliance assurance, file and staff organization, <br />client communications (emails and telephone), and general project oversight and coordination of concepts <br />to be followed in design, staffing, schedule and progress management. <br />1
The URL can be used to link to this page
Your browser does not support the video tag.