My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2017-103 Highway 9 Long Plat
>
Meetings
>
2017
>
06. June
>
2017-06-20 10:00 AM - Commissioners' Agenda
>
Res-2017-103 Highway 9 Long Plat
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2018 12:08:01 PM
Creation date
6/13/2018 12:07:38 PM
Metadata
Fields
Template:
Meeting
Date
6/20/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
o
Item
Request to Approve a Resolution for the Highway 9 Preliminary Plat (LP-17-00005)
Order
15
Placement
Consent Agenda
Row ID
37449
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13. Civil plans will be reviewed and submitted prior to final plat approval in accordance with the <br />development agreement. <br />14. Required Infrastructure and Utilities, as defined in the Development Agreement, shall be installed <br />and completed or bonded or other financial guaranties or accommodations made for their <br />completion prior to final plat approval of each subphase. <br />15. Timing ofImprovements: Per the Suncadia 2009 Development Agreement section 5.3 <br />Infrastructure, Surety Bonding or Other Assurances. Infrastructure identified by Trendwest in an <br />approved Site Development Plan must be provided and available for use before the issuance of <br />the first certificate of occupancy for Master Planned Resort Accommodation Units included <br />within such plan. For purposes of final plat approval or issuance of building permits, <br />infrastructure may be guaranteed through surety bonding or other financial assurance device <br />acceptable to the County. The estimated costs of providing all such guaranteed Infrastructure <br />shall be reviewed and approved by the County Public Works Director or designee. Surety <br />bonding or other acceptable financial device provided to the County shall be in an amount equal <br />to at least 110% of such estimated costs as determined by Trendwest's architects and engineers. <br />16. A Project Report shall be provided indicating that Suncadia can serve the water demands of the 14 <br />additional connections while maintaining adequate pressures. If piping infrastructure is not <br />already present, the Applicant shall submit Construction Documents depicting the design of the <br />water system. <br />NOW, THEREFORE BE IT RESOLVED: That the Kittitas County Board of Commissioners <br />hereby grants preliminary plat approval to the Highway 9 Preliminary Plat (LP-17-00005) and adopts <br />the above Findings of Fact, Conclusions of Law, and Conditions of Approval and the same hereby <br />is, approved with the proposed development configuration (See Exhibit A). <br />DA TED this 2-O·tyl day of ) W~ , 2017 at Ellensburg, Washington. <br />J <br />BOARD OF COUNTY COMMISSIONERS <br />KITTITAS COUNTY, WASHINGTON <br />Obie O'Brien, Commissioner
The URL can be used to link to this page
Your browser does not support the video tag.