Laserfiche WebLink
AMENDMENT #11 <br />Program Specific Requirements/Narrative <br />Special References (RCWs, WACs, etc) <br />Chapter 246-290 WAC is the set of rules that regulate Group A water systems. By this statement of work, ODW contracts with the LHJ to conduct sanitary surveys (and SPIs, and <br />provide technical assistance) for small community and non-community water systems with groundwater sources. ODW retains responsibility for conducting sanitary surveys (and <br />SPIs, and provide technical assistance) for small community and non-community water systems with surface water sources, large water systems, and systems with complex <br />treatment. <br />LHJ staff assigned to perform activities under tasks 1, 2, and 3 must be trained and approved by ODW prior to performing work. See special instructions under Task 4, below. <br />Special Billing Requirements <br />The LHJ shall submit quarterly invoices within 30 days following the end of the quarter in which work was completed, noting on the invoice the Quarter and year be in g billed for. <br />Payment cannot exceed a maximum accumulative fee of $J9,600 $18,800 for Task 1, and U,4I)() $3,000 for Task 2, Task 3 and Task 4 combined during the contracting period, <br />to be paid at the rates specified in the Payment Method/Amount section above. When invoicing for sanitary s urv eys. bill half to BARS Reve nue Code 346.26.64 and half to BARS <br />Revenue Code 346.26.65. <br />When invoicing for Task 4, submit receipts and the signed pre-authorization form for non-employee travel to the ODW Program Contact below and a signed A 19-1A Invoice <br />Voucher to the DOH Consolidated Contracts Office, billing to BARS Revenue Code 346.26.66 under Technical Assistance (TA). <br />Special Instructions <br />Task 1 <br />Trained LHJ staffwill evaluate the water system for physical and operational deficiencies and prepare a Final Sanitary Survey Report which has been accepted by ODW. Detailed <br />guidance is provided in the Field Guide for Sanitary Surveys, Special Purpose Investigations and Technical Assistance (Field Guide). The sanitary survey will include an <br />evaluation ofthe following eight elements: source; treatment; distribution system; finished water storage; pumps, pump facilities and controls; monitoring, reporting and data <br />verification; system management and operation; and certified operator compliance. If a system is more complex than anticipated or other significant issues arise, the LHJ may <br />request ODW assistance. <br />• No more than 4 surveys of non-community systems with three or fewer connections to be completed between January 1,2015 and December 31, 2015. <br />• No more than 5 surveys of non-community systems with four or more connections and all community systems to be completed between January 1,2015 and <br />December 31,2015. <br />• No more than 1 surveys of non-community systems with three or fewer connections to be completed between January 1,2016 and December 31, 2016. <br />• No more than #) 9 surveys of non-community systems with four or more connections and all community systems to be completed between January 1,2016 and <br />December 31, 2016. <br />• No more than 2 surveys of non-community systems with three or fewer connections to be completed between January 1,2017 and December 31, 2017. <br />• No more than 6 surveys of non-community systems with four or more connections and all community systems to be completed between January 1,2017 and <br />December 31 , 2017. <br />The process for assignment of surveys to the LHJ, notification of the water system, and ODW follow-up with unresponsive water systems; and other roles and responsibilities of <br />the LHJ are described in the Field Guide. <br />Task2 <br />Trained LHJ staff will perform Special Purpose Investigations (SPIs) as assigned by ODW. SPIs are inspections to determine the cause of positive coliform samples or the cause of <br />other emergency conditions. SPIs may also include sanitary surveys of newly discovered Group A water systems. Additional detail about conducting SPIs is described in the Field <br />Guide. The ODW Regional Office must authorize in advance any SPI conducted by LHJ staff. <br />Exhibit A, Statements of Work <br />Revised as of March 15, 2017 <br />Page 6 of 17 Contract Number C 17114-11