My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2017-087 River Ridge Plat
>
Meetings
>
2017
>
05. May
>
2017-05-16 10:00 AM - Commissioners' Agenda
>
Res-2017-087 River Ridge Plat
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2018 12:02:11 PM
Creation date
6/13/2018 12:01:48 PM
Metadata
Fields
Template:
Meeting
Date
5/16/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
i
Item
Request to Approve a Resolution Approving the River Ridge Plat (LP-17-00003)
Order
9
Placement
Consent Agenda
Row ID
36691
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
development agreement. <br />17. Required Infrastructure and Utilities, as defined in the Development Agreement, shall <br />be installed and completed or bonded or other financial guaranties or accommodations <br />made for their completion prior to final plat approval of each subphase. <br />18. Timing ofImprovements: Per the Suncadia 2009 Development Agreement section 5.3 <br />Infrastructure, Surety Bonding or Other Assurances. Infrastructure identified by Trendwest in <br />an approved Site Development Plan must be provided and available for use before the <br />issuance of the first certificate of occupancy for Master Planned Resort Accommodation <br />Units included within such plan. For purposes of final plat approval or issuance of building <br />permits, infrastructure may be guaranteed through surety bonding or other financial <br />assurance device acceptable to the County. The estimated costs of providing all such <br />guaranteed Infrastructure shall be reviewed and approved by the County Public Works <br />Director or designee. Surety bonding or other acceptable financial device provided to the <br />County shall be in an amount equal to at least 110% of such estimated costs as determined <br />by Trendwest's architects and engineers. <br />19. The sewer lift station shall be constructed in the development tract southeast of the proposed plat, <br />as outlined in the Engineering Summary of application materials, and shown on the Conceptual <br />Utility Plan shall be constructed and operational prior to final plat approval. <br />NOW, THEREFORE BE IT RESOLVED: That the Kittitas County Board of Commissioners <br />hereby grants preliminary plat approval to the River Ridge Preliminary Plat (LP-17-00003) and adopts <br />the above Findings of Fact, Conclusions of Law, and Conditions of Approval and the same hereby <br />is, approved with the proposed development configuration (See Exhibit A). <br />DATED this / Uf11 day of v~ I~ ,2017 at Ellensburg, Washington. <br />BOARD OF COUNTY COMMISSIONERS <br />KITTITAS COUNTY, WASHINGTON <br />~=an <br />Laura Osiadacz, Vice Chairmalt <br />IJ1L~L <br />Obie O'Brien, Commissioner
The URL can be used to link to this page
Your browser does not support the video tag.