My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order 1
>
Meetings
>
2017
>
05. May
>
2017-05-16 10:00 AM - Commissioners' Agenda
>
Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2018 12:02:27 PM
Creation date
6/13/2018 12:01:27 PM
Metadata
Fields
Template:
Meeting
Date
5/16/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
d
Item
Request to Approve Change Order No. 1 for the Courthouse Feasibility Study and Predesign
Order
4
Placement
Consent Agenda
Row ID
36691
Type
Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 28, 2016 <br />Architects Rasmussen Triebelhorn, AIA/ps <br />9 St. Helens Ave, Suite D <br />Tacoma, WA 98402 <br />Attention: Kenn Triebelhorn <br />Regarding: Kittitas County Courthouse Expansion <br />Fee Proposal -Predesign Engineering Services <br />Regarding: (1) Email RFP from ART dated 04/19/2016 <br />Dear Kenn, <br />We are pleased to provide this proposal for engineering services for the "Phase 2" <br />predesign of the referenced project. We will provide electrical, telecommunications <br />and electronic security engineering services in accordance with reference (1) and the <br />following. <br />Proposed Scope of Services <br />The scope of work includes predesign and planning services for the proposed new <br />170,000 square foot courthouse and administration building in Ellensburg, Washington. <br />Our services include the following related to electrical, telecommunications and <br />electronic security systems: <br />• Review and coordinate building programmatic requirements <br />• Prepare and coordinate conceptual design considerations <br />• Assist ART in planning for a new courthouse, including up to two development <br />concept options <br />• Prepare conceptual design narrative <br />• Prepare conceptual cost opinion <br />Our deliverables will include (1) system narrative for preliminary planning, (2) input to <br />planning documentation for new courthouse and (3) ROM cost opinions. <br />Mfl H>"~d?~ ~ ~rr: ~1t'1\1 • 1 <br />I ; i:' <br />• i: <br />HARGIS <br />IJOllli ud ,WP IHII,' <br />!NGINEfR§
The URL can be used to link to this page
Your browser does not support the video tag.