My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA ALSC Architects
>
Meetings
>
2016
>
12. December
>
2016-12-20 10:00 AM - Commissioners' Agenda
>
PSA ALSC Architects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2018 11:51:45 AM
Creation date
6/13/2018 11:50:40 AM
Metadata
Fields
Template:
Meeting
Date
12/20/2016
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
f
Item
Request to Approve a Professional Services Agreement with ALSC Architects for the Barn Project
Order
6
Placement
Consent Agenda
Row ID
33758
Type
Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT "A" <br />SCOPE OF WORK <br />The Architect shall provide documents for the following : <br />A. Demolition of Clockum Room and Wash Rack. <br />Survey and historic evaluation of Clockum Room building for National Register of <br />Historic Places in accordance with DAHP requirements. <br />8. Construct pre-engineered metal structure (lean-to) on east side of Pavilion. <br />• Metal siding and roof with 6' high concrete masonry wall on east side; north and <br />south ends to be open <br />• Concrete floor with trench drain <br />• Provide large opening in east wall for access to adjacent barns <br />• Provide general lighting <br />No HVAC or plumbing required <br />C. Improvements to Bloom Pavilion. <br />Add radiant heating to keep space above 50° <br />• Provide better ventilation for cooling in summer months <br />• Cut large opening in east wall for access to barns to the east <br />• Replace roofing <br />• Reseal panel joints <br />• Provide new exit door at west wall <br />• Add fire hydrant (at Poplar and 5th Street) as requested by Fire Department <br />D. Two new wash rack pads <br />• Provide concrete slab with trench drain <br />• Provide half-high concrete masonry wall along one side <br />• Provide ten hose-bibs equally spaced <br />• Locate one wash rack on the east side of the Bloom Pavilion Lean-to and the other <br />on the east side of the Draft Horse Barn <br />Professional Services Agreement <br />Page 13
The URL can be used to link to this page
Your browser does not support the video tag.