My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord-2016-024
>
Meetings
>
2016
>
12. December
>
2016-12-06 10:00 AM - Commissioners' Agenda
>
Ord-2016-024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2018 11:50:53 AM
Creation date
6/13/2018 11:50:15 AM
Metadata
Fields
Template:
Meeting
Date
12/6/2016
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
v
Item
Request to Approve an Ordinance Approving the Preliminary Planned Unit Development of Big Creek Trails
Order
22
Placement
Consent Agenda
Row ID
33390
Type
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ordinance 2016-tJ Pf <br />(KCC 13.04.09 (1)(£)). <br />J. Any plat within the Planned Unit Development is subject to any easements of record and does not <br />modify such easements. <br />k. Construction upon the PUD and final PUD approval will be contingent upon the applicant receiving <br />approval of a substantial development permit, SD-15-00002, from the County with review from the <br />State Shorelines Hearings Board. No structures will occur within 200 feet of any shoreline of the <br />State as indicated by the applicant. <br />III. Environmental and Open Space <br />a. Category I wetlands require a 50' buffer from the wetland delineation in accordance to KCC 17 A.02. <br />Category IT wetlands require a 25' buffer from the wetland delineation in accordance to KCC <br />17 A. 02. Category III wetlands require a 20' buffer from the wetland delineation in accordance to <br />KCC 17A.02. <br />h. Setbacks to the shorelines of Big and Little Creek shall be consistent with the Shoreline Substantial <br />Development Permit (SD-15-00002). <br />c. A Hydraulic Project Approval (HPA) permit shall be obtained for any work that would influence <br />flow or bed of either Big or Little Creek. <br />d. The Applicant shall establish a riparian corridor being 200 feet wide measured from the Ordinary <br />High Water Mark (OHWM), as per RCW 90.58.030, of Big Creek in an easterly direction onto the <br />PUD property, and of Little Creek in a westerly direction onto the PUD property. <br />e. The Applicant shall place signs marking the riparian and wildlife movement corridors of Big Creek <br />and of Little Creek. A minimum of four (4) signs will be placed upon the Big Creek corridor and a <br />minimum of four (4) signs will be placed upon the Little Creek corridor. Signs shall be a minimum <br />of 36" square. Signs shall be placed prior to the first final plat recording. Applicant shall submit a <br />map that shows the location of the signs prior to the first plat being recorded. Signs will also identify <br />these areas as a wildlife movement corridor. <br />f. The riparian corridor of Big Creek and of Little Creek shall be marked with signs, flagging or other <br />suitable material prior to the beginning of construction and during construction, which shows the <br />limit of any allowed ground disturbance. Markings shall remain in place during any and all <br />construction related to the development of the PUD. <br />g. There shall be no disturbance, without approved permits, within the Big Creek or Little Creek <br />riparian areas during the construction of the PUD. <br />5
The URL can be used to link to this page
Your browser does not support the video tag.