Laserfiche WebLink
21. The project will comply with KCC Title 14, Buildings and Construction. <br />22. The project will comply with KCC Title 17.29, Forest and Range zoning. <br />23. The project will comply with KCC Title 17.60A, Conditional Uses and meets <br />the criteriaofKCC 17.60A.015 (1-7), as conditioned. <br />24. The project will maintain rural character of the area by observing all setbacks <br />depicted in the site plan. <br />25. Hazardous slopes in excess of 35% exist on the property. All new additions will be <br />at least 200 feet from these slopes, as indicated on the site plan and staff maps. <br />26. All buildings and structures shall require full engineering for lateral gravity and <br />fire life-safety. <br />27. All restroom, meeting, and parking facilities shall be ADA accessible. <br />28. All structures must have adequate fire apparatus access. <br />29. Fire sprinklers shall be required in the new office building. <br />30. Exterior siding and materials shall meet with wildland-urban interface <br />requirements. <br />31. Any gates must meet all standards outlined in KCC 20.03020. <br />33. Should groulld disturbin& or other activitie result in the inadvertent cliscovery of <br />cultural or archaeologic~1 materials,. work shall be stopped in the immedi~te area <br />and contact. be" made With the Washll1gton tate DAHP. Work shall remam <br />susp nded until the tind is as essed and appropriate consultation is conducte . <br />Should human remains be inadvertently djsco ~e l'ed as dictated by Washington <br />State RCW 27.44.055, work ha.11 be immediately halted in the area and eontaet <br />made with the coroner and local law enforcement in the most expeditious manner <br />possible. <br />32. All outdoor lighting shall be shielded and directed downward to minimize the <br />effect to nearby residential properties and SR 10. <br />33 . Any signage for the proposed use will require a sign permit as per KCC 17.70 <br />and may not be located in State or County right of way. <br />34. The project will continue to be served by existing fire, school district, and <br />Waste Management services.