My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2016-144
>
Meetings
>
2016
>
11. November
>
2016-11-01 10:00 AM - Commissioners' Agenda
>
Res-2016-144
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2018 11:53:09 AM
Creation date
6/13/2018 11:48:58 AM
Metadata
Fields
Template:
Meeting
Date
11/1/2016
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
j
Item
Request to Approve a Resolution for the 2017 Distressed County Sales and Use Tax Infrastructure Improvement Program Agreement with the City of Cle Elum
Order
10
Placement
Consent Agenda
Row ID
32766
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Question 11: Assumptions/Justifications/Metllodology/Calculations <br />The City, many organizations, and members of the community have realized the importance of <br />tourism in our community and the positive affect it has on our current businesses, community, <br />along with the ability to bring in additional businesses. Preparing a comprehensive stormwater <br />design for construction purposes is one of the first steps in beautifying the downtown and <br />surrounding community, as well as being efficient with the different infrastructure systems. <br />It is assumed that enhancing sidewalks, reducing street widths, and adding parking will make the <br />City more attractive for tourists to stop and shop. Infrastructure design gets the City one step <br />closer to completing this. We believe, after construction, this will not only retain several <br />businesses, but attract new businesses. Currently there are many businesses that have complained <br />to the City regarding poor stonnwater facilities and drainage issues. It is safe to say that this <br />design project would show good faith in attempting to resolve their concerns. A business <br />retention number of five was based upon the number of stonnwater complaints the City receives <br />a year. <br />Question 12: Assumptions/JustificationslMethodoIogy/Calculations <br />We anticipate employing six people while working on a comprehensive stonnwater design. This <br />number would increase significantly once the design is complete and eventually moves into the <br />construction phase. This project will require hiring a company to survey the City of Cle Elum <br />locating catch basins, current snow holding areas, and main trunk lines which will be done by <br />two field surveyors and one surveying technician. Once this is complete one Professional Civil <br />Engineer and one Design Engineer will work together to create the comprehensive stormwater <br />system. A project manager will oversee each segment that is to be included in the design of the <br />stonnwater revitalization project. <br />The importance of knowing the concerns the community and businesses have with the current <br />state of the stormwater infrastructure will provide the best outcome for a design. With the <br />stonnwater system design then construction the ability for the city to continue to prosper and <br />allow other city enhancements in turn will create stability for current and room for new job <br />opportunities.
The URL can be used to link to this page
Your browser does not support the video tag.