Laserfiche WebLink
NO. <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />City of Kittitas <br />Main Street Sewer and lift Station <br />Estimated Project Cost <br />(May 2015 ENR National Construction Cost Index # 10036) <br />UNIT <br />DESCRIPTION QUANTITY UNIT PRICE <br />Mobilization/Demobilization 1 LS $16,000 <br />Trench Excavation and Safety Systems LS $3,000 <br />8-lnch Gravity Sewer 400 LF $50 <br />2-lnch Force Main 750 LF $20 <br />Manholes 1 EA $3 ,000 <br />Bank Run Gravel tor Trench Backfill 40 CY $25 <br />lift Station 1 LS $30 ,000 <br />Electrical LS $30 ,000 <br />Sewer Service 4 EA $10,000 <br />HMA Pavement Repair 420 SY $50 <br />Surface Restoration 1 LS $5 ,000 <br />Subtotal (rounded): <br />Contingency (15%): <br />Construction Subtotal : <br />Sales Tax (8 .0%) <br />Total Construction Cost <br />Engineering, Legal, and Administra l ion (25%) <br />Total Estimate Construction Cost <br />Right-ot-Way Acquisition <br />AMOUNT <br />$16,000 <br />$3 ,000 <br />$20,000 <br />$15,000 <br />$3,000 <br />$1 ,000 <br />$30,000 <br />$30,000 <br />$40,000 <br />$21,000 <br />$5 ,000 <br />$184,000 <br />$28,000 <br />$212,000 <br />$17 ,000 <br />$229 ,000 <br />$58,000 <br />$287,000 <br />$1,000 <br />$288 ,000