Atkinson Construction Page I <br />5274 Lodge Creek Culvert Replacement 0712612016 16:26 <br />Phil Larson <br />Activity <br />Resource <br />BID ITEM <br />Desc <br />10000 <br />Description = Materials <br />Quantity <br />Pcs Unit <br />Cost Rcport <br />Unit <br />Cost <br />Equip . <br />Labor All Costs <br />Land Item SCHEDULE: 100 <br />Unit = LS Takeoff Quan: <br />Expend. <br />Matis. <br />1.000 <br />Penn. Sub <br />Matis. Contract <br />EngrQuan: <br />30000105 Buy Perm Marrerillt Quan: 1.00 LS Drs/Sblt: 8.00 Cat: 508 WC: WA0201 <br />eSBe under box = 2'x40'x40' = 120 cy <br />eSBC on Road = 200'x24'x2' = 355 cy <br />Total = 475 cy. <br />Common Borrow is a guess for now. Only needed if the existing material can not be put back. <br />Quarry Spalls = 3'x40'x40' = 177 cy -Say 250 cy to cover other potential needs . <br />River Rock -TBO <br />Stream Bed -40'x4'x20 ' = 120 cy in box, double quantity to include pool 240 cy. <br />Gravel backfill for I'Ia11s = I~e assumed 5' wide around all walls. <br />Geogrids quantities are a place holder for now. <br />We ~ill still need to finalize pricing on all material . <br />2AGCSBCCY CSBe "CY"@I08% 1.00 475.00 CY 40.000 <br />2AGGCBCY Common Borrow "CY@10 1.00 500.00 CY 30 .000 <br />2AGGWQSCY Quarry Spalls "CY@108% 1.00 250.00 CY 40 .000 <br />2AGGWRRCY River Rock "CY"@108% 1.00 1.00 CY 40.000 <br />2AGGWSTMBRCStream Bed Materi@108% 1.00 240.00 CY 100 .000 <br />2AGGWWALL Gravel Backfill f@108% 1.00 230.00 CY 40.000 <br />2GEOGM8XT MIRAGRID 8XT@]()8% 1.00 900.00 SY 4.500 <br />2GEOTEXSEP GEOlEX-SOIL SEPAR@l l.00 355.00 SY 0.650 <br />2UBFF FULLFLATTOPULT@10 l.00 2.00 EA 65 .000 <br />2UBFSB FULL SIZE ULTRABL@1 1.00 16.00 EA 70 .000 <br />2URHB HALF ULTRABLOCK S@ l.00 4.00 EA 60.000 <br />2UBHFT HALF FLAT TOP ULT@l l.00 4.00 EA 55 .000 <br />$108,765.94 [ ] <br />24,829 <br />19,602 <br />13,068 <br />52 <br />31,363 <br />12,023 <br />5,293 <br />302 <br />170 <br />1,464 <br />314 <br />288 <br />108,766 <br />Total <br />1.000 <br />··Unreviewl:d <br />24,829 <br />19,602 <br />lJ,068 <br />52 <br />31,363 <br />12,023 <br />5,293 <br />302 <br />170 <br />1,464 <br />314 <br />288 <br />108,766 <br />108,765.94 108,765.94 <br />> Item Totals: 10000 -Materials <br />$108,765.94 <br />108,765.940 1 LS <br />BID ITEM = 10000 <br />Description = Stockpile <br />30001030 Pre-Stock PlIe Material <br />Pre-Stockpile material before closure. <br />Assume 1 week of wo r k with a loader and <br />LD966 LOADER 966D. OP, LAB <br />8LD966 WHEEL LOADER CAT 96 1.00 <br />LCOM LABORER, COMMON G# l.00 <br />OFELL OP ENG FE LDR <6 CY G 1.00 <br />[ ] 108,766 108,766 <br />108,765.94 108,765.94 <br />Landltern SCHEDULE: 100 <br />Unit = LS TakeoffQuan: 1.000 Engr Quan: 1.000 <br />Quan: 1.00 LS Hn/Sbft: 10.00 Cal: 510 WC: WA0201 <br />··Unn:vicwcd <br />laborer on the ground for backing up t ru c ks. <br />50 .00 HR <br />50.00 MH <br />50.00 MH <br />100.00 MH <br />50.00 CH Prod: 5.0000 S Lab Pes: <br />74 .235 4,850 <br />34.420 <br />39 .570 <br />[ 5249 .59] <br />3,654 <br />4,572 <br />8,226 4,850 <br />2.00 Eqp Pes: 1. 00 <br />4,850 <br />3,654 <br />4.572 <br />$13,076.35 100.0000 MI-ULS <br />100.0000 MHlUnit 0.0200 UnitslHr 8,225.86 4,850.49 <br />13,076 <br />13,076.35 <br />30001032 Load Out Stockpile QuaD: 1.00 LS Hrs/Sbrt: 12.00 Cal: 612 WC: WA0201 <br />This will be done d u ring the 7 2 hr closure. As sume 2 solos the help move material between the sites . <br />LD966 LOADER 966D, OP, LAB <br />5TRHRDPSOLO DUMP TRUCK SOLO@10 1.00 <br />8LD966 WHEEL LOADER CAT 96 1.00 <br />LCOM <br />OFELL <br />LABORER, COMMON G# 1.00 <br />OP ENG FE LDR <6 CY G 1.00 <br />72.00 <br />144.00 HR <br />72 .00 HR <br />72.00 MH <br />72.00 MH <br />CH Prod: <br />135 .000 <br />74 .235 <br />34.420 <br />39 .570 <br />6.0000 S Lab Pes: 2.00 Eqp Pes: <br />5,707 <br />7,096 <br />6,985 <br />25 ,404 <br />"'*U tlrc\liewed <br />1.00 <br />25,404 <br />6,985 <br />5,707 <br />7,096