My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2016-103
>
Meetings
>
2016
>
08. August
>
2016-08-02 10:00 AM - Commissioners' Agenda
>
Res-2016-103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2018 11:47:26 AM
Creation date
6/13/2018 11:46:24 AM
Metadata
Fields
Template:
Meeting
Date
8/2/2016
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve the Resolution to Award a Contract for the Lodge Creek Culvert Replacement along Via Kachess Road and to Authorize the Public Works Director to Execute the Same
Order
27
Placement
Consent Agenda
Row ID
30912
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1\ tkin~on Constmction <br />5274 Lodge Creek Culvert Replacement <br />Phil Larson <br />Activity <br />Resource <br />Desc <br />BID ITEM = 999800 <br />Description = EQUIPMENT <br />===> Item Totals: 999800 <br />$38,729.70 100.0000 MlIILS <br />38,729.700 I L.<; <br />BID ITEM '" 999900 <br />Description = MISCELLANEOUS <br />==> Item Totals: <br />$0.00 <br />0.000 <br />999900 <br />lLS <br />--> Item Totals: 999000 <br />$106,833.29 100.0000 MHILS <br />t 06,833.290 1 LS <br />$740,069.50 ** * Report Totals <br />»> indicates Non Additive Activity <br />----·Report Notcs:----- <br />Quantity <br />Pes Unit <br />-EQUIPMENT <br />100.00 MH <br />-MISCELLANEOUS <br />-Proj eet Indireets <br />100.00 MH <br />*** 1,969.00 MH <br />The estimate was prepared with BID Quantities. <br />This report shows TAKEOFF Quantities with the resources. <br />"Unreviewed" Activities are marked. <br />Bid Date: Owner: Engineering Finn: <br />Estimator-In-Charge: <br />JOB DOES NOT HAVE NOTES <br />Cost Report <br />Unit <br />Cost <br />Equip. <br />Labor All Costs <br />Land Item SCHEDULE: 100 <br />Unit = LS TakeoffQuan: <br />Expend. <br />Matis. <br />1.000 <br />(5247.72] 8,725 16,695 13,310 <br />8,724.89 16,69481 13,310_00 <br />Land Item SCHEDULE: 100 <br />Unit = LS Takeoff Quan: 1.000 <br />[ ] <br />Total of Above Sub-Bidltcms <br />[ 5247.72 I 42,556 22,684 41,593 <br />42,555.79 22,684.31 41,593.19 <br />197,932 81,216 149,991 <br />.. on units of MH indicate average labor unit cost was used rather than base rate. <br />[ ] in tbe Unit Cost Column = Labor Unit Cost Without Labor Burdens <br />Page 12 <br />07126/2016 16 :26 <br />Perm. Sub <br />Matis. Contract <br />Engr Quan: <br />EngrQuan: <br />Total <br />0.000 <br />38,730 <br />38,729.70 <br />0.000 <br />106,833 <br />106,833.29 <br />170,153 140,778 740,070 <br />In equipment resources, rent % and EOE % not = 100% are represented as XXX%YYY where XXX=Rent% and YYY~EOE% <br />------Calcodar Codes----- <br />410 4-10HRDAYS <br />508 5 - 8 HR DAYS STD WORK WEEK (Default Calendar) <br />509 5 -9 HR DAYS <br />510 5-IOHRDAYS <br />610 6-JOHRDAYS <br />612 <br />SID <br />S12 <br />S8 <br />SX8 <br />WJS <br />W2S <br />XIO <br />X12 <br />6-12 HRDAY <br />SATURDAY -10 HR DAY <br />SATURDAY -12 HRDAY <br />SATUIUJAY -8 HRDAY <br />SA T & SUN -8 HR DAY <br />WEEKEND SINGLE SHIFT NIGHTS <br />WEEKEND WORK ROUND CLOCK <br />SUNDAY -10 HR DAY <br />SUNDAY -12 HR DAY
The URL can be used to link to this page
Your browser does not support the video tag.