Laserfiche WebLink
Atki oson Construction <br />5274 Lodge Creek Culvert Replacement <br />Phil Larson <br />Activity <br />Resource <br />Dese <br />BID ITEM = 999200 <br />Pes <br />Description = ADMIN FACILITIES & SUPPLIES <br />Quantity <br />Unil <br />Cost Report <br />Unit <br />Cost <br />Equip. <br />Labor All Costs <br />Land Item SCHEDULE: 100 <br />Expend. <br />Matis. <br />Unit= LS Takeoff Quan: 1.000 <br />5 ,989.50 <br />Page 9 <br />0712 6/201 6 16 :26 <br />Perm. Sub <br />Matis. Contract <br />EngrQuan : <br />Tol al <br />0 .000 <br />5,989.50 <br />===> Item Totals: <br />$J 1,603.90 <br />999200 -~DMIN FACILITIES & SUPPLIES <br />11,603.900 1 LS <br />BID ITEM = 999300 <br />Description = SAFETY <br />010301 <br />3 SAFEFALL <br />3SAFESUPP <br />$13,068.65 <br />010305 <br />IMD <br />Job Safei)' ExpensCs <br />SAFETY FALL PROT.@l 1.00 <br />SAFETY SUPP.IES@108 1.00 <br />Medical Ellam I Drug Teit <br />Medical Exams/Drug Testin 1.00 <br />-> Item Totals: 999300 -SAFETY <br />$14 ,278 .65 <br />14,278 .650 ILS <br />BID ITEM = 999400 <br />Description = CLEAN-UP <br />010402 DumpSler Service <br />ICUMO Debris BoxlMonthly Trash 1.00 <br />ICUSKIP Skip Box Purchase LOO <br />$6,050.00 <br />010464 Final Clran.Up <br />1.00 EA <br />1.00 MH <br />10 .00 EA <br />3 .00 MO <br />1.00 EA <br />ICUFN Final Clean-Up 1.00 1,000.00 LS <br />==> Item Totals: 999400 " CLEAN-UP <br />$7,260 .00 <br />7,260.000 I LS <br />BID ITEM ., 999500 <br />Description = JOBSITE WORK REQUIREMENTS <br />010514 Small Toob & Suppll~ <br />[ J 5,990 5,614 <br />5,989.50 5,6 14 .40 <br />Land Item S CHEDULE: 100 <br />Unit = LS Takeoff Quan: 1.000 <br />Quan: 1.00 LS lInfShR: 8.00 Cal: 508 <br />10,000.000 13,068 <br />0 .500 I <br />[ I 13,069 <br />13,068.65 <br />QIIOD: 10.00 KA nrslShft: 8.00 Cal: 508 <br />100 .000 1,210 <br />[ ] 14,279 <br />14,278 .65 <br />Land Item SCHEDULE: 100 <br />Unit = LS Takeoff Quan: 1.000 <br />QuaD: 1.00 MO Hn/SUIt: 8.00 Cal: S08 <br />1,000.000 3,630 <br />2 ,000.000 2,420 <br />[ I 6,050 <br />6,050.00 <br />Quan: 10.00 tJR UnlShn: 8.00 Cal: 508 <br />LOOO 1,210 <br />[ 1 7,260 <br />7,260.00 <br />Land Item SCHEDULE: 100 <br />Unit = LS Takeoff Quan : 1.000 <br />Quan: 1.00 LS Hr5/shfi: 8.00 CIII: 508 <br />Th ere are no cost resources jor this activity. <br />010531 OnnWn!: Water QUlin.: 1.00 MO t/nlSbrt: 8.00 Cal: 508 <br />Engr Quan: <br />WC:WA01OI <br />11,604 <br />11,603 .90 <br />0.000 <br />"Unreviewed "Summ Code: FOH <br />13 ,068 <br />I <br />13,069 <br />13,068.65 <br />WC: WA0201 <br />"Umeviewed "Summ Code: FOH <br />1,210 <br />14,279 <br />14.27&.65 <br />Engr Quan: 0.000 <br />WC:WAD1OJ <br />"Unreviewed "Summ Code: TRO <br />3 ,630 <br />2,420 <br />6,0511 <br />6,050 .00 <br />WC:WA020J <br />"Unreviewed "Summ Code : FOH <br />1,210 <br />7,260 <br />7,260.00 <br />EngrQuan: 0.000 <br />WC:W,<\020J <br />"Unreviewed "Summ Cooe: FOH <br />WC:WA0201 <br />"IJnreviewed "Sun101 Codo: TR O